ML19338E217
| ML19338E217 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 08/07/1980 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19338E216 | List: |
| References | |
| NUDOCS 8009250196 | |
| Download: ML19338E217 (2) | |
See also: IR 05000369/1980021
Text
(7Q'
-
o
n
/
'o
UNITED STATES
l'=,-
Eg
NUCLEAR REGULATORY COMMISSION
o
y,
/ e
REGION 11
% *2LA[a *
o
101 MARlETTA ST.. N.W., SUITE 3100
,o#
%
ATLANTA, GEORGIA 30303
AUG
7 1980
In Reply Refer To:
-
Ril:GLT
50-369/80-21
Duke Power Company
ATTN:
W. O. Parker, Jr.
)
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
i
Gentlemen:
j
This refers to the inspection conducted by G. L. Troup of this office on July 14-18,
1980, of activities authorized by NRC Construction Permit No. CPPR-83 for the
McGuire facility, and to the discussion of our findings held with R. J. Wilkinson
at the conclusion of the inspection.
.
Areas examined daring the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
4
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
I
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
!
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that
the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
,
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
,
Sincerely,
.
,,
.
s
. P ilip St
r, C ief
uel Facility and Materials
'
Safety Branch
I
Enclosure:
(See Page 2)
.
8009250 %
..
-.
. .-
-
.- ._ - _ .
-
r
e
.o
7 1980
Duke Power Company
-2-
Enclosure:
Inspection Report No. 50-369/80-21
cc w/ encl:
'
M. D. McIntosh, Plant Manager
J- C. Rogers, Project Manager
.
l
l
.