ML19338E205

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-566/80-11 & 50-567/80-11 on 800715-17 & Notice of Violation
ML19338E205
Person / Time
Site: Yellow Creek  
Issue date: 08/04/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19338E206 List:
References
NUDOCS 8009250109
Download: ML19338E205 (2)


See also: IR 05000566/1980011

Text

o

,

'

/

'o

UNITED STATES

g

E"

NUCLEAR REGULATORY COMMISSION

o

A -

-

'

s

REGION 11

0

8

101 MARIETTA sT., N.W., SUITE 3100

ATLANT. , GEORGIA 30303

AUG -41980

In Reply Refer To:

/80-11

'

QO-567/80-1

-

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

i

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by M. Thomas of this office on July 15

through 17, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-

172 and CPPR-173 for the Yellow Creek Nuclear Plant facility, and to the discus-

.

sion of our findings held with M. M. Price at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

i

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

During the inspection it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pectinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

Corrective actions to prevent recurrence were completed prior to

the conclusion of this inspection; therefore, a reply is not requested.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or y~.:r contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

nation identified in the application is contained in a separate pa_rt of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

80092sc/W

p

U.

.

r

Tennessee Valley Authority

-2-

bDb ~

.

Should you have any questions concerning this letter, we will be glad to discuss

{

them with you.

Sincerely,

,

NA

/

.

.

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-566/80-11

nd 50-567/80-11

cc w/ encl:

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. M. Price, Project Manager

M. A. McBurnett, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

,

.