Text
o
,
'
/
'o
UNITED STATES
g
E"
NUCLEAR REGULATORY COMMISSION
o
A -
-
'
s
REGION 11
0
8
101 MARIETTA sT., N.W., SUITE 3100
ATLANT. , GEORGIA 30303
AUG -41980
In Reply Refer To:
/80-11
'
QO-567/80-1
-
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
i
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by M. Thomas of this office on July 15
through 17, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-
172 and CPPR-173 for the Yellow Creek Nuclear Plant facility, and to the discus-
.
sion of our findings held with M. M. Price at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
i
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pectinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
Corrective actions to prevent recurrence were completed prior to
the conclusion of this inspection; therefore, a reply is not requested.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or y~.:r contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
nation identified in the application is contained in a separate pa_rt of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
80092sc/W
p
U.
.
r
Tennessee Valley Authority
-2-
bDb ~
.
Should you have any questions concerning this letter, we will be glad to discuss
{
them with you.
Sincerely,
,
NA
/
.
.
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-566/80-11
nd 50-567/80-11
cc w/ encl:
J. F. Cox, Supervisor, Nuclear
Licensing Section
M. M. Price, Project Manager
M. A. McBurnett, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
,
.
l
L.