Forwards Revision 1 to IE Bulletin 79-26, Boron Loss from BWR Control Blades. Written Response Required
ML19338D576
Person / Time
Site: Dresden, Quad Cities  Constellation icon.png
Issue date: 08/29/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8009230478
Download: ML19338D576 (1)


Text

(- -,

,i g-ne at

'o UNITED STATES E

  • g NUCLEAR REGULATORY COMMISSION n

A IE

- REGION 111

.Ba

'f 799 ROOSEVkLT ROAD

  • E D

GLEN ELLYN. ILLINOIS 60137

  1. g

,o Docket Nos. 50-10, 50-237, 50-249; 50-254-, 50-265 Commonwealth Edison Company-ATTN:

Mr. Cordell-Reed Vice President Post Office Box 767 Chicago, IL --60690'-

Gentlemen:

The enclosed IE Bulletin No. 79-26, Revision'1, is forwarded'to you for action.

The original IE Bulletin No. 79-26 has been revised to adjust the required completion date for reportina the results of examinatica of an exposed control-blade and to correct a typographical error. The revisian is identified by use of "R1" in.the right margin.

In order to assist'the NRC in evaluating the value/ impact of each bulletin on licensees,_it-would be helpful if.you would provide an estimate of the manpower expended in conduct of the review and preparation of the reports required by the bulletin. Please estimate separately the manpower associated with corrective actions necessary following identification of problems through the bulletin.

A written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely,.

qS

/ James G

. Keppler Director

Enclosure:

IE Bulletin No. 79-26, Revision 1 cc w/ enc 1:

Mr. J. S. Able, Directcr AEOD of Nuclear Licensing Resident Inspectors, RIII Mr.' D. J. Scott, Station PDR Superintendent Local PDR Mr. N. Kalivianakis, NSIC

. Plant Superintendent TIC Central Files Mr. Dean Hansell, Office of Director, NRR/DPM Assistant Attorney General Director, NRR/ DOR l 80 0923 0 47 8.

+

.t.

SSINS No.: 6820

./

Accession No.:

UNITED STATES 8006190042 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 August 29, 1980 IE Bulletin No. 79-26 Rev. 1 BORON LOSS FROM BWR CONTROL BLADES Description of Circumstances:

The General Electric Company (GE) has informed us of a failure mode for control blades which can cause a loss of boron poison material.

Hot cell examinations of both foreign and domestic blades have revealed cracks near the upper end of stainless steel tubing and loss of boron from the tubes.

The cracks and boron i

loss have so far "een confined to locations in the poison tubes with more than 50 percent Boron-10 'B10) local depletion.

Observed crack sizes range from a quarter to a half inch in length and from onc to two mils in width.

GE has postulated that the cracking is due to stress corrosion induced by solidification of boron carbide (8 C) particles and swelling of

  • 4 compacted 4

B C as helium and lithium concentrations grow.

Once primary coolant penetrates 4

the cladding (i.e., the cracking has progressed through the cladding wall and the helium-lithium pressures are sufficient to open the crack), boron is 10 leached out of the tube at locations with more than 50 percent B local depletion (local depletion is considered to be twice the average depletion).

It was further found with similar cracking but with less than 50 percent local 10 depletion of B, that leaching did not occur even though primary coolant had penetrated the cladding.

The cracking and Loron loss shorten the design life of the control blade.

According to the GE criteria the end of design life is reached when the reactivity worth of the blade is reduced by 10 percent, which corresponds to uarter of the control blade.

10 DUPLICATE DOCUMENT d the allowance for B deple-1 blade from the 42 percent Entire document previously entered into system under:

h ANO No. of pages: