p ter
[
o,
UNITED STATES
I')
NUCLEAR REGULATORY COMMISSION
,
o
N
E
REGION il
2
"o, ~J
f
101 MARIETTA ST,, N.W SUITE 310o
O
o
ATLANTA, GEORGIA *0303
- .***
In Reply Refer To:
RII:RFL
JUL 2 51980
0-1 5 /80-24 ~h
50-366/80-2 M
-
.
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by R. F. Rogers of this office on May 13
through June 9,1980 of activities authorized by NRC Operating License No. DPR-57
and License No. NPF-5 for the Hatch facility, and to the discussion of our findings
held with M. Manry at the conclusion of the inspection.
.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolve! dems. The status of these items is discussed
in the enclosed report.
During the inspection it was found that certain activities under your license
appear to be in noncompliance with NRC requirements.
This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
Corrective actions to prevent recurrence were completed prior to
the conclusion of this inspection, therefore, a reply is not requested.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such Anformation from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified period,'
the report will be placed in the Public Document Room.
4
8009220$e5
Q
..
-
.
- . .
. . _ . .
._
..
,
__
. . - _ _
_ __
. _ _ . . . - _ _
_ . _ _ . _. - - - _ _ . ___
l'
i..-
'
JUL 2 51980
Georgia Power Company
-2-
.o
Should you have any questions concerning this letter, we will be glad to discuss
2
'
them with you.
Sincerely,
i
,
!-
E-c.
R. C.
ewis, Acting Ci.ief
Reactor Operations and I,'aclear
'
Support Branch
.
Enclosures:
1
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/80-24
'
j
and 50-366/80-24
cc w/ enc 1:
M. Manry, Plant Manager
-
C. E. Belflower, Site QA Supervisor