ML19338D134
| ML19338D134 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/23/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19338D126 | List: |
| References | |
| NUDOCS 8009190588 | |
| Download: ML19338D134 (2) | |
See also: IR 05000348/1980016
Text
n
-
. y"
5
7
- pa neog#o
UNITED STATES
g
!
NUCLEAR REGULATORY COMMISSION
n
.*
$
- E
REGION 11
%
/
101 MARIETTA sT
N.W., sulTE 3100
%*****/
AT4.ANTA, GEORGIA 30303
JUL ? ? 1990
.
In Reply Refer To:
RII:WPA
50-348/80-16
50-364/80-19
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by W. P. Ang of this office on June 17
through 20, 1980 of activities authorized by NRC License No. NPF-2 and Construc-
tion Permit No. CPPR-86 for the Farley Nuclear Plant facility, and to the discus-
sion of our findings held with W. D. Hairston and J. A. Mooney at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's. " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including
(1) corrective steps which have been taken by you and the results achieved; (2)
{
corrective steps which will be taken to avoid further noncompliance; and (3) the
'
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any.information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of.the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary .
information identified in'the application is contained in a separate part of the
j
document. If we do not hear from you in this regard within the specified period,
'
the report will'be placed in the Public Document Room.
8009190 $7
-
.
(
p-
,
.
-*
g
Alabama"PowerLCompany
-2-
.
JUL 2 3 loc 0
l'
- Should-you'have any questions concerning this letter, we will be glad to discuss
' them with you.
Sincerely,
lhp
. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
t
Enclosures:
1.
~ Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-348/80-16
and 50-364/80-19
j
cc.w/ encl:
A. R. Barton, Executive Vice President
F. L. Clayton, Jr., Senior Vice President
L-
H..O. Thrash, Manager-Nuclear Generation
.0. D. Kingsley, Jr., Manager, Nuclear Engineering
i
and Technical Services.
!
J. W. McGowan, Manager-Operations
- Quality Assurance
'
W. G. Hairston, III,-Plant Manager
i
W.1:. Petty,- Manager-Quality Assurance
(Design and Const ruction)
l
R. E. Hollands, Jr., QA Supervisor
,
l
!
l
r
l;
=,
__-
^
.
-
-%
a
6
5
m La4
4
-e
L-
w
s
"w-n---------
--
---
x-
-- ---
-
~A-