Forwards IE Insp Repts 50-348/80-16 & 50-364/80-19 on 800617-20 & Notice of Violation
ML19338D134
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/23/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19338D126 List:
References
NUDOCS 8009190588
Download: ML19338D134 (2)


See also: IR 05000348/1980016

Text

n

-

. y"

5

7

  1. pa neog#o

UNITED STATES

g

!

NUCLEAR REGULATORY COMMISSION

n

.*

$

E

REGION 11

%

/

101 MARIETTA sT

N.W., sulTE 3100

%*****/

AT4.ANTA, GEORGIA 30303

JUL ? ? 1990

.

In Reply Refer To:

RII:WPA

50-348/80-16

50-364/80-19

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by W. P. Ang of this office on June 17

through 20, 1980 of activities authorized by NRC License No. NPF-2 and Construc-

tion Permit No. CPPR-86 for the Farley Nuclear Plant facility, and to the discus-

sion of our findings held with W. D. Hairston and J. A. Mooney at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's. " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including

(1) corrective steps which have been taken by you and the results achieved; (2)

{

corrective steps which will be taken to avoid further noncompliance; and (3) the

'

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any.information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of.the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary .

information identified in'the application is contained in a separate part of the

j

document. If we do not hear from you in this regard within the specified period,

'

the report will'be placed in the Public Document Room.

8009190 $7

-

.

(

p-

,

.

-*

g

Alabama"PowerLCompany

-2-

.

JUL 2 3 loc 0

l'

Should-you'have any questions concerning this letter, we will be glad to discuss

' them with you.

Sincerely,

lhp

. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

t

Enclosures:

1.

~ Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-348/80-16

and 50-364/80-19

j

cc.w/ encl:

A. R. Barton, Executive Vice President

F. L. Clayton, Jr., Senior Vice President

L-

H..O. Thrash, Manager-Nuclear Generation

.0. D. Kingsley, Jr., Manager, Nuclear Engineering

i

and Technical Services.

!

J. W. McGowan, Manager-Operations

- Quality Assurance

'

W. G. Hairston, III,-Plant Manager

i

W.1:. Petty,- Manager-Quality Assurance