Notifies of Completed OL Application Review.Nrc Safety Review Will Be Initiated.Early Response to Encl Request for Addl Info Re FSAR & Environ Rept Necessary to Facilitate Detailed Technical Review.W/O Encl
ML19338D034
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 08/29/1980
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Koch L
ILLINOIS POWER CO.
References
NUDOCS 8009190115
Download: ML19338D034 (3)


Text

.,

, p*4c%

y 7,;-J[k

[

UNITED STATES NUCLEAR REGULATORY COMMISSION g

WASHINGTON, D. C. 20S55 h5 2 910$J$

Docket Nos.:

50-461/462 Mr. L. J. Y,och, Vice President Illinois Power Company 500 South 27th Street Decatur, Illinois 62325

Dear Mr. Koch:

SUBJECT:

ACCEPTANCE REVIEW FOR THE CLINTON POWER STATION, UNITS 1 AND 2 On December 1,1979, you tendered an application for operating licenses for the Clinton Power Station, Units 1 and 2.

Your application included a Final Safety Analysis Report (FSAR), Environmental Report - Operating License Stage (ER), a Physical Security Plan and General Information.

We have completed our review of your tendered application and have concluded that it is sufficiently complete to permit us to initiate our safety review.

i-Accordingly, your filing of the application should include three (3) originals signed under oath or affirmation by a duly authorized officer of your organiza-l tion.

In addition, your filing should include fifteen (15) copies of that por-tion of the application containing the general information, forty (40) copies of the Final Safety Analysis Report and forty-one (41) copies of the Environmental Report. As required by Section 50.30 of 10 CFR Part 50 and Section 51.40(b) of 10 CFR Part 51, you should retain an additional ten (10) copies of the general infomation, thirty (30) copies of the Final Safety Analysis Report and one hundred nine (109) copies of the Environmental Report for direct distribution in accordance with Enclosure 1 to this letter and further instructions which might be.provided later. Within 10 days after filing, you must provide an affidavit that distribution has been made in accordance with this enclosure. All subse-quent amendments to the Final Safety Analysis Report will require sixty (60) copies for distribution.

Our conclusion that the FSAR and ER are sufficiently complete is based on our evaluation of all information filed taken as a whole, with the realization that s,ut:tantive deficiencies may exist that need to be corrected during the review.

Enclosed for your information' and use is a copy of NUREG-0694 entitled "TMI Related Requirements for New Operating Licenses". This report lists the current TMI related requirements which have been approved by the Commission and apply to plants seeking 'a new operating license. The Clinton FSAR should be amended to satisfy the requirements of NUREG-0694.

In addition, you should reference all NRC regulations in 10 CFR Parts 20; 50; 51; and 100 and cite the sections in the FSAR where they are addressed and where compliance is demonstrated, and reference any previous NRC reviews on systems or analyses which are common to.the Clinton plant.

1 800919.0 fgg f

Mr. L. J. Koch gG o 91%0 L

lou'will be advised ~ of key milestones of the review as soon as a schedule is developed. During-the course of our. preliminary review 'of your License Applica-tion, FSAR and ER, the enclosed." Request for Additional' Infomation" (Enclosure

2) was-generated.

These requests are of the type _ which require an early re-sponse to facilita;e the ensuing detailed technical review. You should provide -

a schedule for. responding to our " Request for Additional Infomation". We will then prepare our-schedule for. the review of Clinton.

'f during-the course of our review, you believe there is a need to appeal a staff position because of disagreement, this need should be brought to the staff's attention as early as possible so that the appropriate meeting can be arranged on a timely basis. A written request is not necessary and all such requests should be initiated through our staff project manager assigned to the

_ review of your application, Bart Buckley. - This procedure is an informal one, designed to allow opportunity for applicants to discuss with management, areas of disagreement in,the case review.

incerely, h

lb{}

Darrell G.[Eisenhut, irector Division of Licensing Office of Nuclear Reactor Regulation-

Enclosures:

As stated-L cc'w/o enclosures:

See_next page i

i l

?"

l

E ru

~

cc:

Mr.- Peter V. Fazio,.Jr.:

Schiff, Hardin'& Waite 7200 Sears Tower 1 233 South Wacker Drive Chicago, Illinois 60606 q

Hr. George Wulleri Licensing Coordinator-Illinois Power Company.

500 South 27th Street Decatur,- Illinois 62525 b

--m_

r