-_
p % EIoq s
4 UNITED STATES c
E 7
NUCLEAR REGULATORY COMMISSION h,
uE REGION 111 799 ROOSEVELT ROAD GLEN ELLYN. ILLINOIS 60137 o
Docket No. 50-358 Cincinnati Gas and Electric Company ATTN:
Mr. Earl A. Borgmann Senior Vice President Engineering Services and Electric Production 139 East 4th Street Cincinnati, OH 45201 Gentlemen:
The enclosed Information Notice supplements Information Notice No. 80-06 " Notification of Significant Events," and provides clarification on types of events that are required to be reported in accordance with 10 CFR 50.72, " Notification of Significant Events."
Sincerely, Sb
' James G. Kep r
Director
Enclosures:
1.
Supplement to IE Information Notice No. 80-06 2.
List of Recently Issued IE Information Notices cc w/ encl:
Mr. J. R. Schott, Plant Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Citizens Against a Radioactive Environment Helen W. Evans, State of Ohio e008250339 q
UNITED STATES SSINS No.: 6870 NUCLEAR REGULATORY COMMISSION Accessions No.:
0FFICE OF INSPECTION AND ENFORCEMENT 8006190035 WASHINGTON, D.C.
20555 July 29, 1980
~
Supplement to IE Information Notice No. 80-06 IiOTIFICATIONOFSIGNIFICANTEVENTSATOPERATINGPOWERKACTORFACILI Description of Circumstances:
IE Information Notice No. 80-06 (IN 80-06) issued on February 27, 1980, forwarded a Federal Register Notice which indicated that the NRC regulations were amended by adding a new S 50.72, " Notification of significant events", to 10 CFR Part 50.
The effective date of the new rule was February 29, 1980.
This Information Notice supplements IN 80-06 and provides clarification on types of events that are required to be reported in accordance with the rule.
Public comments on the rule indicate the need for more detailed clarification on what occurrences are reportable in regard to certain event types listed in the rule.
Commenters particularly stressed the need to establish more defini-tive thresholds for notifications of certain types of events.
Experience so,
far with notifications being made in accordance with S 50.72 also suggest the-need for clarification aid more definitive guidance.
The general categoriza.
tion of some of the even. types listed in the rule has resulted in notifica-tions of events of less significance than was originally intended.
As stated in the Federal Register tatice implementing 5 50.72, the rule was intended to require immediate notification of " serious events that could result in an impact on the public health and safety."
The notification requirements in S 50.72 are currently being evaluated to determine actions needed in light of public comments on and experience with the rule.
Notwithstanding future actions which may include some modifications to the rule and supplementary regulatory guidance, a short term need exists for clarifying the thresholds for notifications of certain categories of events.
The following paragraphs provide clarification on what is reportable pursuant to the event categories listed in items (1), (7) and (9) of the rule.
Item (1) of S 50.72(a) requires notification of: "Any event requiring initiation of the licensee's emergency plan or any section of that plan."
Notifications under this item refer to those initiating events or conditions that place the facility in a " Notification of Unusual Event" status.
An unusual event indicates a potential degradation of the level of safety of the plant.
Examples of initiating events or conditions that would be categorized as an unusual event are listed on the enclosed pages 4 and 5 of NUREG-0610,
" Draft Emergency Action Levei Guidelines for Nuclear Power Plants" (Appendix 1 to NUREG-0654, " Criteria for Preparation ana Evaluation of Radiclogical Emergency Response Plans and Preparedra-- i W aaa+_
%"el m Da m D13nh" L. _
a' It is recognized that some overlap anc requirements of item (1) and other itt DUPLICATE DOCUMENT En+ ire document previously er*eredintosystemur[ie S006/9003 xuo No. of pages:
Y
--