Forwards IE Insp Repts 50-491/80-09,50-492/80-08 & 50-493/ 80-08 on 800611-13.No Noncompliance Noted
ML19338C345
Person / Time
Site: Cherokee  
Issue date: 07/22/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19338C341 List:
References
NUDOCS 8008150186
Download: ML19338C345 (2)


See also: IR 05000491/1980009

Text

,

,

s

I

>R htc

o

UNITED STATES

NUCLEAR REGULATORY COMMISSION

~

o

$$

.E

REGION il

c

g'['

101 MARIETTA ST., N.W.. SUITE 3100

,,

g

ATLANTA, GEORGIA 303o3

i

+...+

JUL 2 21980

In Reply Refer To:

RII:ALC

50-491/80-9

50-492/80-8

50-493/80-8

Duke Power Company

ATTN:

L. C. Dail, Vice President

Design Engineering

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by A. L. Cunningham of this office on

June 11 through 13, 1980 of activities authorized by NRC Construction Permit Nos.

CPPR-167, CPPR-168, and CPPR-169 for the Cherokee Nuclear Station facility, and

to the discussion of our findings held with S. B. Hager at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

q

selective examinations of procedures and representative records, interviews with

C'

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

,

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full sta'tement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

,

Q

.

il~p Sto

ief

.

,

Fuel Facilit and Materials

(a)

Safety Branch

Enclosure:

See Page 2

80081501 N

'

, _ _ _ _ . _ . _ . _ . _ _ _ . . _ . . _ . _ _ _ . _ _ _ _ _ . . _ _ _ _ , _ _ _ _ . _ . _ . . _ . . . _ _ _ _ . . . . . _ . _ _ _ _ _ _ . _ . . _ . . . . _ . . _ _ . _ _ _

-

_

.

,

j . 1,

T

,

o

JUL 2 21980

i

'

-Duke Power Company

-2-

f. x, .

{

1P

i

l

Enclosure *

!

-

l

Inspection Report Nos. 50-491/80-9, -

,,

i

'50-492/80-8 and 50-493/80-8

i

r

,

!

i

.'

cc w/ enc 1:

i

-

J. T. Moore, Project Manager

,

I

-

i

l

'

i

i

i

k

I

l

I

i

.

!

-

I

!

'

!

l

,

4

i

.

.

1

-

1

1'

+

1

l.

i

!

?

-l

!

.

i

1

0

{

. >

,

$

!

a

i

i

I

4

J

i

',

I

f

i

T

f

s

j o

,

1

i

5

$

l

i

.i

,

!

'

'

i

w.-.-~-+--~.~,,~~..

. ~ . - . - . ~

.

- - - - - -

-

.---I