ML19338C265
| ML19338C265 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 06/17/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML19338C266 | List: |
| References | |
| NUDOCS 8008140312 | |
| Download: ML19338C265 (2) | |
See also: IR 05000324/1980021
Text
$a aert,,9'o
/b
,
UNITu] STATES
8
~g
NUCLEAR REGULATORY COMMISSION
g -3,ff
n
-
c
REGION 11
L
o,
101 MARIETTA ST., N.W SulTE 3100
[Md
%.....
ATLANTA, GEORGIA 30303
JUN 1 71980
In Reply Refer To:
RII:JE0
50-324/80-21
50-325/80-24
Carolina Power and Light Company
ATTN:
J. A. Jones
Senior Executive Vice President and
Chief Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
This refers to the inspection conducted by J. E. Ouzts of this office on May 3
through May 31, 1980 of activities authorized by NRC Operating License Nos.
DPR-62 and DPR-71 for the Brunswick facility, and to the discussion of our
findings held with A. C. Tollison at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection ;eport.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews eith
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
>
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them ith you.
Sincerely,
E.c.
R. C.
ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
See Page 2
l
}
80esu o 3 /2
_
.
JUti 1 71990
Carolina Power and Light Company
-2-
Enclosure:
Inspection Report Nos. 50-324/80-21
and 50-325/80-24
cc w/ encl:
A. C. Tollison, Jr., Plant Manager
.