ML19338B832

From kanterella
Jump to navigation Jump to search
Submits Addl Info Re Operator Training Program,In Support of 740820 Request to NRC for Exams
ML19338B832
Person / Time
Site: Oconee, Crane  Duke Energy icon.png
Issue date: 09/04/1974
From: Parker W
DUKE POWER CO.
To: Collins P
US ATOMIC ENERGY COMMISSION (AEC)
References
TASK-TF, TASK-TMR NUDOCS 8001200026
Download: ML19338B832 (2)


Text

.

-~

\\

o DUKE POWER COSIPMY h

Powen Deu.nwo

i

.m socin Cnuncu Srnr.er. Cuantorre. N. C. 2saw

/N i

/

September 4,1974 o n.u w a., c a. a.

in,.. n e r.n :e.e Tc.c.-c,~ o. o n.

c u., r.. -- -

3 7...e.3

'l i

3 Mr. Paul F. Collins, Chief Operator Licensing Branch Directorate of Licensing Atomic Energy Coc=ission Washington, D. C. 20545

Dear Mr. Collins:

In support of our letter of August 20, 1974 requesting operator licensing examinations at Oconee Nuclear Station and in accordance with our telecon of August 27, 1974 we are submitting the following additional information.

The applicants for R. O. examinations will participate in a two week training program at the B&W Simulator in Lynchburg, Virginia. This prograr will include 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> classroom and 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> console time, consisting of:

a)

One reactor startup - all rods in to 10-8 amps.

b)

One reactor startup and plant heatup - hot shutdown to 10% power.

c) Two reactor startups and plant heatups - hot shutdown to 20% power, d)

One reactor startup and plant heatup - hot shutdown to 80% power.

e)

Power operations with auto and manual ICS operations:

1) 100% - 30% - 80%

i i

11)

FDW pump trip 4

111) _ Turbine trip iv) - Reactor trip and recovery v) Dropped rod and recovery vi) Steam leaks vii)

Spray V:.V failure 8001200O&

777T..

~

~

1.+

?.,

af t.

M' g

(

D),' a 1

Mr. Paul Collins Septecher 4, 1974 f

l l

This program includes the 5-day hot license certification program submitted by B&W to you in a separate letter and will be culminated by a reactor startup exam on the final day of simulator training.

B&W will furnish certification letters on those candidates successfully completing that portion of the two week training period which includes the 5-day hot license certifications.

B&W will send the originals of these letters to Duke Power Company, Oconee Nuclear Station and copies to AEC Operator Licensing Branch.

Very truly yours, n

,/$h /c E

(

(

W. O. Parker, Jr.

f; Assistant Vice President RB/db t

l l

_ _ - _ _ _ _ _ _ _ _ _