Correction of Errors Associated with Amendment Nos. 129 and 32 Regarding Changes to Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9 (EPID L- 2018-LLA-0492)
ML19338B776
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 12/16/2019
From: Kimberly Green
Plant Licensing Branch II
To: Jim Barstow
Tennessee Valley Authority
Green K, 415-1627
References
EPID L-2018-LLA-0492
Download: ML19338B776 (13)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 December 16, 2019 Mr. James Barstow Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A-C Chattanooga, TN 37402-2801

SUBJECT:

WATIS BAR NUCLEAR PLANT, UNITS 1 AND 2 - CORRECTION OF ERRORS ASSOCIATED WITH AMENDMENT NOS. 129 AND 32 REGARDING CHANGES TO TECHNICAL SPECIFICATIONS 3.8.1, 3.8.7, 3.8.8, AND 3.8.9 (EPID L-2018-LLA-0492)

Dear Mr. Barstow:

By letter dated November 26, 2019 (Agencywide Documents Access and Management System Accession No. ML19238A005), the U.S. Nuclear Regulatory Commission (NRC or the Commission) issued Amendment Nos. 129 and 32 to Facility Operating License Nos. NPF-90 and NPF-96 for the Watts Bar Nuclear Plant (Watts Bar), Unit 1 and Unit 2, respectively. These amendments were in response to your application dated November 26, 2018, as supplemented by letters dated May 13, 2019, and October 9, 2019.

The amendments revised Watts Bar, Unit 1 and Unit 2, Technical Specification (TS} 3.8.1, "AC [Alternating Current] Sources - Operating"; TS 3.8.7, "Inverters - Operating"; TS 3.8.8, "Inverters - Shutdown"; and TS 3.8.9, "Distribution Systems - Operating," to support performance of the 6.9 kilovolt and 480 volt shutdown boards maintenance.

Subsequent to issuance of the amendments, the NRC staff noticed missing revision bars in revised TS pages 3.8-2b for the "(continued)" word that was added in the ACTIONS heading.

Also, in the Attachment pages, a "---" should have appeared in the Remove Pages column for new page 3.8-42a for Unit 1, and a "---" should have appeared in the Remove Pages column for new pages 3.8-4a and 3.8-38a for Unit 2.

In addition, the licensee notified the NRC of an error in page 3 of the Watts Bar, Unit 2, license, which was associated with the wording of the existing License Condition 2.C.(4). This license condition should have read as follows:

(4)

PAD4TCD may be used to establish core operating limits until the WBN Unit 2 steam generators are replaced with steam generators equivalent to the existing steam generators at WBN Unit 1 *.

Enclosed are the replacement pages associated with these amendments. The revised Attachment pages and TS pages contain a marginal line indicating the area of change. We apologize for any inconvenience caused.

Docket Nos. 50-390 and 50-391

Enclosures:

1. Corrected TS page 3.8-2b for Unit 1
2. Corrected TS page 3.8-2b for Unit 2
3. Corrected Attachment page for Unit 1 4 Corrected Attachment page for Unit 2
5. Corrected. page 3 for Unit 2 cc: Listserv Sincerely, r~;u c- ~,c:_

Kimberly J. Green, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

ENCLOSURE 1 CORRECTED TS PAGE 3.8-2b FOR UNIT 1

ACTIONS (continued)

CONDITION C.

Two DGs in Train A C.1 inoperable.

OR Two DGs in Train B inoperable.

AND C.2 AND C.3.1 C.3.2 C.4 Watts Bar-Unit 1 REQUIRED ACTION Perform SR 3.8.1.1 for the required offsite circuits.

Declare required feature(s) supported by the inoperable DGs inoperable when its required redundant feature(s) is inoperable.

Determine OPERABLE DGs are not inoperable due to common cause failure.

OR Perform SR 3.8.1.2 for OPERABLE DGs.

Restore DGs to OPERABLE status.

AC Sources-Operating 3.8.1 COMPLETION TIME 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition C concurrent with inoperability of redundant required feature(s) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 24 hours 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 6 days from discovery of failure to meetLCO (continued) 3.8-2b Amendment 30, 39, 84, 103, 110, 129

ENCLOSURE 2 CORRECTED TS PAGE 3.8-2b FOR UNIT 2

ACTIONS (continued)

CONDITION C. Two DGs in Train A inoperable.

Two DGs in Train B inoperable.

Watts Bar - Unit 2 C.1 AND C.2 AND C.3.1 C.3.2 AND C.4 REQUIRED ACTION Perform SR 3.8.1.1 for the required offsite circuits.

Declare required feature(s) supported by the inoperable DGs inoperable when its required redundant feature(s) is inoperable Determine OPERABLE DGs are not inoperable due to common cause failure.

OR Perform SR 3.8.1.2 for OPERABLE DGs.

Restore DGs to OPERABLE status.

3.8-2b AC Sources - Operating 3.8.1 COMPLETION TIME 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition C concurrent with inoperability of redundant required feature(s) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 24 hours 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 6 days from discovery of failure to meet LCO (continued)

Amendment 5, 32

ENCLOSURE 3 CORRECTED ATTACHMENT PAGE FOR UNIT 1

ATTACHMENT TO AMENDMENT NO. 129 WATTS BAR NUCLEAR PLANT, UNIT 1.

FACILITY OPERATING LICENSE NO. NPF-90 DOCKET NO. 50-390 Replace page 3 of Facility Operating License No. NPF-90 with the attached revised page 3.

Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.

Remove Pages 3.8-1 3.8-2 3.8-2a 3.8-2b 3.8-3 3.8-4 3.8-5 3.8-38 3.8-40 3.8-41 3.8-42 Insert Pages 3.8-1 3.8-2 3.8-2a 3.8-2b 3.8-3 3.8-4 3.8-5 3.8-38 3.8-40 3.8-41 3.8-42 3.8-42a

ENCLOSURE 4 CORRECTED ATTACHMENT PAGE FOR UNIT 2

ATTACHMENT TO AMENDMENT NO. 32 WATIS BAR NUCLEAR PLANT, UNIT 2 FACILITY OPERATING LICENSE NO. NPF-96 DOCKET NO. 50-391 Replace page 3 of Facility Operating License No. NPF-96 with the attached revised page 3.

Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.

Remove Pages 3.8-1 3.8-2 3.8-2a 3.8-2b 3.8-3 3.8-4 3.8-34 3.8-36 3.8-37 3.8-38 Insert Pages 3.8-1 3.8-2 3.8-2a 3.8-2b 3.8-3 3.8-4 3.8-4a 3.8-34 3.8-36 3.8-37 3.8-38 3.8-38a

ENCLOSURE 5 CORRECTED PAGE 3 FOR UNIT 2

Unit 2 C.

The license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act, and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified or incorporated below.

(1)

Maximum Power Level TV A is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 32 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. TVA shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3)

TVA shall implement permanent modifications to prevent overtopping of the embankments of the Fort Loudon Dam due to the Probable Maximum Flood by June 30, 2018.

(4)

PAD4TCD may be used to establish core operating limits until the WBN Unit 2 steam generators are replaced with steam generators equivalent to the existing steam generators at WBN Unit 1.

(5)

By December 31, 2019, the licensee shall report to the NRC that the actions to resolve the issues identified in Bulletin 2012-01, "Design Vulnerability in Electrical Power System," have been implemented.

(6)

The licensee shall maintain in effect the provisions of the physical security plan, security personnel training and qualification plan, and safeguards contingency plan, and all amendments made pursuant to the authority of 1 O CFR 50.90 and 50.54(p ).

(7)

TVA shall fully implement and maintain in effect all provisions of the Commission approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and

,10 CFR 50.54(p). The TVA approved CSP was discussed in NUREG-0847, Supplement 28, as amended by changes approved in License Amendment No. 7.

(8)

TVA shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Report for the facility, as described in NUREG-0847, Supplement 29, subject to the following provision: