Forwards Order for Mod of License Re Environ Qualification of safety-related Electrical Equipment
ML19337B643
Person / Time
Site: Pilgrim
Issue date: 08/29/1980
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Andognini G
BOSTON EDISON CO.
Shared Package
ML19337B644 List:
References
NUDOCS 8010080333
Download: ML19337B643 (2)


Text

.

h o

UNITED STATES w

y g

y,

,,( 3 g NUCLEAR REGULATORY COMMISSION

[.4 g.*

.: E WASHINGTON. D. C. 20555 j

s.;-

a August 29, 1980 Docket No. 50-293 Mr. G. Carl Andognini Bosten Edison Cog any M/C NUCLEAR 800 Boylston Street Boston, Massachusetts 02199

Dear Mr. Andognini:

SUBJECT:

Environmental Qualification of Electrical Equipment I

This letter transmits an order which requires information to support the environmental qualification of safety related electrical equipment at Pilgrim Nuclear Power Station.

The Comission's Memorandum and Order of May 23, 1980 addresses safety related electrical equipment exposed to a harsh environment, inside or outside containment, resulting from an accident.

The Order requires that all such equipment in operating reactors be fully qualified by June 30,1982.

To coglete this objective, you are required to submit, by November.1, 1980, all information to support a safety evaluation of the aforemen-tiened equipment.

If your facility had an established comitment date before November 1,1980, it is fully expected that your submittal will be not later than that comitment date.

If your facility's commitment date is past without a cortplete submittal, it is strongly recommended that actions be expedited since they have already impacted the staff rev'ew schedule.

Briefings were held with all interested licensees during the week of July 17,1980. Enforcement actions relative to this Order were discussed during these briefings.

Si ncer21y,

/.

m*J Thomas A. Ippolito, Chief Operating Reactors Branch 42 Division of Licensing

Enclosure:

Order cc:

See next page f

l Bol o gg y

_gy3

U o

.\\7 Mr. G. Carl Andognini

_29, 1980 Boston Edison Conipany August cc:

Mr. Paul J. McGuire U. S. Environmental Protection s

Pilgrim Station Acting Manager Agency Boston Edison Company Region I Office RFD #1, Rocky Hill Road ATTN:

EIS COORDINATOR Plymouth, Massachuretts 02360 JFK Federal Building Boston, Massachusetts 02203 Energy Facilities Siting Council 14th. Flour One Asburton Place.

Boston,' Massachusetts 02108 Henry Herrmann, Esquire Massachusetts Wildlife Federation 151 Tremont Street Boston, Massachusetts 02111 Plymouth Public Library 1

North Street Plyinouth, Massachusetts 02360 Massachusetts Department of Public Health ATTN: Commissioner of Public Health 600 Washington Street Boston, Massachusetts 02111 Water Quality & Environmental Commissioner Department of Environmental Quality 4

Engineering 100 Cambridge Street Boston, Massachusetts 02202 Mr. David F. Tarantino Chairman, Board of Selectmen 11 Lincoln Street Plymouth, Massachusetts 02360 Director, Technical Assessment Division Office of Radiation Programs (AW 459)

US EPA Crystal Mall #2 Arlington, Virginia 20460 Resident Inspector c/o U. S. NRC P. O. Box 867 Plymouth, Massachusetts 02360

=

4

< qey %9%

k g,> k'7,,

q$"'84

.,N N

.N V

IMAGE EVALUATION TEST TARGET (MT-3) 1 1

l I

1.0 l#a EM E

e'?

2=22

=

m i

l,l h=*hN 1

1.25 1.4 1.6 4

6~

=

I l

MICROCOPY RESOLUTION TEST CHART 4

4%

+4 4M,,/Mk

  1. )#,,g,4 a

////

n f6

'%g)9 f,"

//g%%Y, f$

'k[r,,{$

//// Y

  • tl?/

l8' 4)<y>gy@'

/ff l

TEST TARGET (MT-3) i 1.0 l; m s2 l

l# S3 Ikin

[E[HM I.l 1.8 1.25 1.4 1.6 4

m 4

6" I

i MICROCOPY RESOLUTION TEST CHART i

i e#,A 4+W/h

'e azzrz

<>3\\es

+ 4?

i, w..,

  1. s@* q ~"

4*

O

(&

l

. -