ML19337B459

From kanterella
Jump to navigation Jump to search
Forwards Application to Amend App a of Licenses DPR-44 & DPR-56,revising Tech Spec Sections 3.1 & 4.1 Re Max Average Planar Linear Heat Generation Rate & Reactor Protector Sys Response Time.Fee Forwarded
Date released: 12/17/2019 Download: ML19337B459


Addenda 6 to LOCA Analysis for Peach Bottom Atomic Power Station Unit 2.
ML19337B464
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/30/1980
From:
GENERAL ELECTRIC CO.
To:
References
Download: ML19337B464 (6)
Errata & Addenda Sheet 2 to LOCA Analysis for Peach Bottom Atomic Power Station Unit 3.
ML19337B463
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/30/1980
From:
GENERAL ELECTRIC CO.
To:
References
Download: ML19337B463 (7)
Proposed Amend to Tech Spec Sections 3.1 & 4.1 Re Max Average Planar Linear Heat Generation Rate & Reactor Protector Sys Response Time
ML19337B461
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/30/1980
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
Download: ML19337B461 (7)
Application to Amend App a of Licenses DPR-44 & DPR-56, Revising Tech Spec Sections 3.1 & 4.1 Re Max Average Planar Linear Heat Generation Rate & Reactor Protector Sys Response Time.Certificate of Svc Encl
ML19337B460
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/30/1980
From: Bauer E, Boyer V, Bradley E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
Download: ML19337B460 (8)
Forwards Application to Amend App a of Licenses DPR-44 & DPR-56,revising Tech Spec Sections 3.1 & 4.1 Re Max Average Planar Linear Heat Generation Rate & Reactor Protector Sys Response Time.Fee Forwarded
ML19337B458
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/30/1980
From: Bradley E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML19337B458 (1)