ML19337B172
| ML19337B172 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 08/14/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| Shared Package | |
| ML19337B173 | List: |
| References | |
| NUDOCS 8010010376 | |
| Download: ML19337B172 (2) | |
See also: IR 05000483/1980020
Text
'o
UNITED STATES
NUCLEAR REGULATORY COMMISSION
T@
[
),
g
~r
REGION 111
'
"
,
$
[
799 ROOSEVELT ROAD
%
,d
GLEN ELLYN, ILLINOIS 60137
AUG 14 G80:
Docket No. 50-483
Union Electric Company
ATTN:
Mr. John K. Bryan
Vice President - Nuclear
Post Office Box 149
St. Louis, MO 63166
Gentlemen:
This refers to the inspection conducted by Mr. W. A. Hansen of this office
on July 1-31, 1980, of activities at Callaway, Unit 1, construction site
authorized by NRC Construction Permit No. CPPR-139 and to the discussion
of our findings with Mr. Weber and others of the Callaway staff at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office within
thirty days of your receipt of this notice a written statement or expla-
nation in reply, including for each item of noncompliance: (1) corrective
action taken and the results achieved; (2) corrective action to be taken
to avoid further noncompliance; and (3) the date when full compliance will
be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,
and your response to this letter will be placed in the NRC's Public Document
Room, except as follows.
If the enclosures contain information that you or
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty days of your receipt of this letter, to withhold
such information from public disclosure. The application must include a full
statement of the reasons for which the information is considered proprietary,
and should be prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
.
801001U3Ho
Q
. - -
.
e
AUG 1 4 G60
2-
Union Electric Company
-
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
-
t
.
G. Fiorelli, Chief
Reactor Construction and
!
Engineering Support Branch
'
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Report
No. 50-483/80-20
cc w/encls:
Mr. W. H. Weber, Manager
Nuclear Construction
Central Files
Reproduction Unit NRC 20b
Local PDR
Regions I & IV
Ms. K. Drey
Mr. Ronald Fluegge, Utility
Division, Missouri Public
Service Commission
>
.