ML19337B166
| ML19337B166 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/18/1980 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19337B167 | List: |
| References | |
| NUDOCS 8010010365 | |
| Download: ML19337B166 (2) | |
See also: IR 05000423/1980005
Text
T2<.-
'
,
c
4
UNITED STATES
g
/
4
NUCLEAR REGULATORY cOMMisslON
f
h
REGION I
- 8
f
631 PARK AVENUE
KING OF PRUS$l A, PENNSYLVANI A 19406
Docket No. 50-423
AUS 18 W
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering Operations
P. O. Boy 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection No. 50-423/80-05
This refers to the routine inspection conducted by Mr. R. Feil of this office
on July 18, 23 and 24, 1980, at Millstone Nuclear Power Station, Unit No. 3,
W3+.erford, Connecticut of activities authorized by NRC License No. CPPR-113
ano +.o the discussions of our findings held by Mr. W. Sanders on July 18 and
R. Fe:1 on July 24, 1980 with Mr. S. Toth of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective naminations of procedures
and representative records, interviews with personaal, ana observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report ~ contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must be accompanied by an affidavit executed by the owner of the
information, which identifies the document or part sought to be withheld, and
which contains a statement of reasons which addresses with specificity the items
which will be considered by the Commission as listed in subparagraph (b) (4) of
Section 2.790.
The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
R
800101o 56 5
.
o
.
Northeast Nuclear Energy Company
2
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/
"
Robert T. Carlson, Chief
Reactor Construction and Engineering
.
Support Branch
Enclosure:
Office of Inspection and Enforcement
Inspection Report No. 50-423/80-05
1
cc w/ encl:
K. W. Gray, Construction Quality Assurance Lead
H. R. Nims, Director of Nuclear Projects
J. F. Opeka, Station Superintendent
J. R. Hinmelwright, Licensing Safeguards Engineer
D. G. Diedrick, Manager of Quality Assurance
!
!
i
i
i
l