Forwards IE Insp Rept 50-302/80-23 on 800505-30.Notice of Violation & Insp Details Withheld (Ref 10CFR2.790)
ML19337A948
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/27/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML19337A944 List:
References
NUDOCS 8010010047
Download: ML19337A948 (2)


See also: IR 05000302/1980023

Text

^

(P

MATERIAL TRAF.SMITTED PERPNITli

s .

aat

CONTAINS 2.73IMFOUI).T 0H

"'

o

UNITED STATES

S

~g

NUCLEAR REGULATORY COMMISSION

n

$

E

REGION 11

'

o,

101 MARIETTA ST., N.W., SUITE 3100

% . . . . . g'

ATLANTA, GEORGIA 303o3

JUN 2 71980

In Reply Refer To:

RII:TGS

50-302/80-23

Florida Power Corporation

ATTN:

J. A. Hancock, Director

Nuclear Operations

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

This refers to the inspection conducted by T. Stetka of this office on May 5

through 30, 1980 of activities authorized by NRC Operating License No. DPR-72

for the Crystal River Nuclear Generating Plant facility, and to the discussion

of our findings held with D. Poole at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notices of Violation enclosed herewith

as Appendix A and Appendix B.

This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you, and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved. Details of activities involving

1

safeguards and security measures are exempt from public disclosure in accordance

with 10 CFR 2.790(d). Therefore, the response to Appendix B requested above

!

should be incorporated in a separate paper and referenced in your reply.

l

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter with the exception of

I

Appendix B and the enclosed inspection report with the exception of Details

2.b (8) will be placed in the NRC's Public Document Room. If this report contains

any information other than that in Details 2.b.(8) that you (or your contractor)

believe to be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

MATER!ALTPE!SMITTED HEREWITH

o010010b6

conIAIN3 2.7solaramall0N

(

-

. _ ,

MATERIALTRAXSMITT[O HEREWITH

.

.

CONTAINS 2.190 INFORMATION

,

JUN 2 71980

Florida Power Corporation

-2-

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

E.c.

R. C.

s, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

,

1.

Appendix A, Notice of Violation

(Not Exempt)

2.

Appendix B, Notice of Violction

j

(Exempt from Disclosure)

i

3.

Inspection Report No. 50-302/80-23, without Details 2.b.(8)

(Not Exempt)

4.

Inspection Report 50-302/80-23, Details 2.b.(8)

(Exempt from Disclosure)

cc w/ enc 1:

D. C. Poole, Nuclear Plant Manager

MATERIALTRANSMITTED HEREWITH

CONTAlHS 2.7S0 INFORMAil0N

_ __