Forwards IE Insp Repts 50-269/80-23 & 50-270/80-20 & 50-287/80-17 on 800602-30 & Notice of Violation
ML19337A884
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/30/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19337A880 List:
References
NUDOCS 8009300630
Download: ML19337A884 (2)


See also: IR 05000269/1980023

Text

_ _ _ _ _ _ - - _ _ _ _

- - - _ __ _ _

_ . .

_. - _ . . _

_

.

.

e

o

UNITED STATES

~g

8

gg

NUCLEAR REGULATORY COMMISSION

3,

'

z

% 310N 11

=

O[

~

101 MARIETTA ST., N.W., SUITE 3100

o

ATLANTA. GEORGIA 30303

.

In Reply Refer To:

JUL 3 01980

RII:FJ

50-269/80-23

.

50-270/80-20

50-287/80-17

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by F. Jape of this office on June 2

through 30, 1980 of activities authorized by NRC Operating License Nos. DPR-38,

DPR-47 and DPR-55 for the Oconee facility, and to the discussion of our findings

held with J. E. Smith at the conclusion of the inspection.

-

The inspection was an examination of the activities conducted under your license

as they relate to radiation safety and to compliance with the Commission's rules

and regulations and the conditions of your license. The inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

cs Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will ha plac,-d in the NRC's Public Document Room. If this report contains

cny infornation that you (or your contractor) believe to be proprietary, it is

recessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full stater;ent of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

nation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

.

8009800 h O

.-

__ __

_ _ _ _ _

.

.

-

.

0 1980

Duke Power Company

-2-

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

.

E.c.

-

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure.:

'

1

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-269/80-23

50-270/80-20 and 50-287/80-17

cc w/ enc 1:

J. E. Smith, Station Manager

.

.

4

/ *