05000366/LER-1980-105-03, /03L-0:on 800821,nitrogen Pressure Was Lost to Both Standby Liquid Control Sys Accumulators.Caused by a Test Valve Leak & B Test Valve Being Broken While Installing Test Gauge.Test Valves Replaced

From kanterella
(Redirected from ML19337A562)
Jump to navigation Jump to search
/03L-0:on 800821,nitrogen Pressure Was Lost to Both Standby Liquid Control Sys Accumulators.Caused by a Test Valve Leak & B Test Valve Being Broken While Installing Test Gauge.Test Valves Replaced
ML19337A562
Person / Time
Site: Hatch 
Issue date: 09/18/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19337A560 List:
References
LER-80-105-03L, LER-80-105-3L, NUDOCS 8009290281
Download: ML19337A562 (2)


LER-1980-105, /03L-0:on 800821,nitrogen Pressure Was Lost to Both Standby Liquid Control Sys Accumulators.Caused by a Test Valve Leak & B Test Valve Being Broken While Installing Test Gauge.Test Valves Replaced
Event date:
Report date:
3661980105R03 - NRC Website

text

'HC F OHM 34,6 U.a.hULLLun HLbutalUn a Lu

.6 siv.4 h71)

LICENSEE EVENT REPORT

(

! coNTnst Stop:e l

l l

l l

l@

(PLEASE PnlNT On TYPE ALL nEOUIRED INFoHMATioN) 0_0 l G l A l E lI l11 l 2 l@l0 l0 l-l0' l0 l0 l010 l-l0 l0 l@l 4l 1l 1l 11 1l@]

l l@

8 9 LICENSEE CODE 14 lb LICENSE NUYULH 2b 20 LICLNSL TYPE Jo b/ LAT $8 con'r

)Iil Sg 'y l L l@l 0 l 5 l 0 l 0 l0 l 3 l 6 l6 l@l_ 0] 8l 21 1l 8l 01@l0 l 9 l1 l 81810 l@

8 to

(,1 pocg&T NuvuEH eal 63 LVENT DATE 74 7b HEPORT DATE 80 EVENT DESCHIPTioN AND PHOBADLE CONSEoVENCES h 0121 l During steady state power operation, nitrogen pressure was lost to both I

o13l l Stand-by Liquid Control System Accumulators.

The SBLC system was admin-l o 141 l istratively declared inoperable as per Tech Specs 3/4.1.5.

This is a I

nis] l non-repetitive occurrence and there were no effects to public health or l

O [ r, j l ' safety due,to this event.

I O lil 1 1

l OlH I l 80 r

8 9 DE CODE SUCC E COMPONENT CODE SUBC DE SU DE l P l C l @ [E_j@ l X l @ l V I A l L l V I E l X l@ W @ [ N_j @

TIT]

E 8

9 10 11 12 13 18 13 20 SE QUE NTI AL OCCURRENCE REPOHT HEVISION g g p;ng EVENT YE AR REPOHT NO.

CODE TYPE NO.

@ ai;;;

18101 L--J 1110151 tr_l 10131 IL l

[-j l0l

_ 21 22 23 24 2G 27 28 29 30 31 32 A EN A 11 O J PL NT k T HOURS SB IT D FOR t 8.

PLIE MAN F T fER [A_J@LZJ@

l_z_]@

Lzj@

l 0l Ol 010l l Yl@

W@

lNl@

l Gl 2 l 5 l Ol@

JJ J4 35 30 3'

40 41 42 43 44 47 CAUSE DESCHlPTioN AND CORRECTIVE ACTIONS l

The cause of the event was the accumulators "A" test valve leaking and I

i o i i i

the accumulator "B" test valve being broken while installing a test l

,., i gauge during surveillance testing. Within one hour of discovery the l

i 3 l

test valves had been replaced, accumulators recharged and the system l

3 4 l

returned to service.

I 80 J

B 9 ST s

% POWE H OTHER STATUS dis O fY DISCOVEHY DESCRIPTION y W @ l 0l 9l 9l @ l NA l

l B l@l Operator observation l

Ac?tiviiY COliENT HELEASED OF HCLE ASE AMOUNT OF AC(IVITY LOCATION OF RELE ASE J_]c] LZ_J @ LZ_J@l NA l

l NA l

)

H U 10 gg 44 45 80 PEHSONNEL t XPOSUHES NUMBE R TYPE DE SCHlPTION EE] l 0 l 0101@l z i@l NA l

,E nSON ~ a'i~;ULS DESCniPTO~@

NUenin 10l0101@l NA I

i H 80 i

8 9 11 12 LOSS OF On DAVAGE 10 FACILITY TYPt DE SCHIPitON [z_j@l NA l

i 9 80 l7 H U 10 800929Odh E SCHiritON 4%Udt @l Lt NA l

llllll111111li 2 o 68 69 80 7.

)

R 9 to 912-367-7781 f,

R. T. Nix. Sunt. of Maint, pgone:

NAME OF PnEPAnER.

1 4

o LER#: 50-366/1980-105.

Licensee: Georgia Power Company Facility Name: Edwin I. Hatch Docket #: 50-366

Narrative

Report for LER 50-366/1980-105.

During normal operation on August 21, 1980, nitrogen pressure was lost to both Stand-by Liquid Control System Accumulators, 2C41-A003A & B.

The SBLC systems were administratively declared inoperable as per Tech Specs 3/4.1.5.

The cause of the event was the accumulator " A" nitrogen pressure b'eing found at less then 450 psi and nitrogen pressure being lost to accumulator "B" while performi.ng Stand-by Liquid Control System Pump Operability Test and Relief Valve Test, HMP-2-3702.

Investigation of the problems revealed that the accumulator "A" test valve, 2C41-F003A, was leaking and accumulator "B" test valve, 2C41-F003D, had been broken while installing a test gauge during the surveillance. Within one hour of discovery new test valves were installed, accumulators recharged and the system returned to service.

i The purpose of the SBLC accumulators is to dampen the pressure surges of the l

positive displacement SBLC pump.

It is our contention that although the SBLC l;

system has not been analyzed to function without accumulator pressure, the ll system would have performed its design function.

The generic review revealed i

no inherent problems. This is a non-repetitive event and there were no effects on public health or safety due to this event.

t h

4 i.