ML19337A560

From kanterella
Jump to navigation Jump to search
Forwards LER 80-105/03L-0
Date released: 12/17/2019 Download: ML19337A560


LER 80-105/03L-0:on 800821,nitrogen Pressure Was Lost to Both Standby Liquid Control Sys Accumulators.Caused by a Test Valve Leak & B Test Valve Being Broken While Installing Test Gauge.Test Valves Replaced
ML19337A562
Person / Time
Site: Hatch 
Issue date: 09/18/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19337A562 (2)
Forwards LER 80-105/03L-0
ML19337A559
Person / Time
Site: Hatch 
Issue date: 09/18/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19337A559 (1)