Forwards IE Insp Rept 50-289/80-05 on 800227-29.No Noncompliance Noted
ML19337A197
Person / Time
Site: Crane 
Issue date: 06/12/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19337A194 List:
References
NUDOCS 8009090244
Download: ML19337A197 (2)


See also: IR 05000289/1980005

Text

o

6

.. ,

.

me

UNITED STATES

'

iCw

  • og _

NUCLEAR REGULATORY COMMISSION

' I-

REGION I .

$

l

831 PARK AVENUE

"

2

KING OF PRUS$1A PENNSYt.VANtA 19408

%*****/

JUN 121980

- Docket No. 50-289

Metropolitan Edison Company

-ATTN: .Mr.;R. C.-Arnold

Senior Vice President-

.100 Interpace Parkway

.

-

Parsippany, New Jersey- 07054

Gentlemen:

Subject: Inspection 50-289/80-05

This refers to the inspection conducted by Mr. G. Napuda of this office on

February 27-29, 1980 at the General Pubile Utilities Corporate Offices in

Parsippany, New Jersey of activities authorized by NRC License No. DPR-50 and to

the discussions of our findi.ngs held by Mr. Napuda with Messrs. D. Croneberger,

N. Kazanas and other- members of your staff at the conclusion of the inspection.

'

Areas examined during this inspection are described in the Office of Inspecti,on

and Enforcement Inspection Report which is enclosed with this letter.

Within

. these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

'

inspector.

Within the scope of this inspection,.no items of noncompliance were observed.

'

However, one activity appears to be a deviation from comitments made with.

'

respect to the restart of Unit 1. 'This Item of Deviation is discussed in the

enclosed inspection report.

In your. reply, please include your coments con-

cerning this item, a description of any steps that have been or will be taken to

prevent recurrence, and the date all corrective actions or preventive measures

were or will be completed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infor-

i

mation that-you_ (or your contractor) believe to be proprietary, it is necessary -

that you make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must be accompanied

!

by;an affidavit executed by the owner of the information, which identifies the

document or part' sought to be withheld, and which contains a statement of reasons

.which addresses with specificity the items which will be considered by the

Comission as ~1isted in subparagraph (b)-(4) of Section 2.790.

The information

,

sought to be withheld shall be incorporated as far as possible into a separate

8 00'9 0 D 0 offf

j

a

'

,

  • =

~.

,

,

-

,

Metropolitan Edison Company

2-

JUN 12 1980

,

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to

r

l

. discuss them wi.th you..

Sincerely,

.

Brunner, Chief

ctor Operations and Nuclear

upport Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-289/80-05

.

i

cc w/encls:

J. G. Herbein, Vice President-Nuclear Operations

R. J. Toole, Manager, Unit 1

.

W. E. Potts,-Manager, Radiological Controls, Unit 1

J. J. C611tz, Manager, Plant Engineering, Unit 1

~ L. W.- Harding, Supervisor of Licensing

R. F. Wilson, Director - Technical Functions

-

E. G. Wallace, Licensing Manager

I. R. Finfrock, Jr.

R. W. Conrad

4

J. B. Lieberman,' Esquire

G. F. Trowbridge,-Esquire

.Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment (Without Report)