Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-289/80-05
ML19337A193
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/31/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19337A194 List:
References
NUDOCS 8009090237
Download: ML19337A193 (1)


See also: IR 05000289/1980005

Text

YH

u . W 'p

.

,

d

%c

UNITE 3 STATES

[,c

g

NUCLEAR REGULATORY COMMisslON

E

o

REGION I

U

if

s35 PARK AVENUE

g .,.

g

KING OP PRUS$1 A, PENNSYt.V AM A m06

.....

Docket No. 50-289

31 3 I 1989

Metropolitan Edison Company

ATTN: Mr. R. C. Arnold

Senior Vice President

100 Interpace Parkway

Parsippany.- New Jersey 07054

Gentlemen:

Subject: 50-289/80-05

This refers to the letter dated July 16, 1980, in response to our letter dated

4

June 12, 1980.

These actions were verified by our inspector as documented in IE Inspection

Report 50-289/80-16.

We have no further questions regarding your actions at

-

this time. Thank you for informing us of the corrective and preventive actions

documented in your letter.

-

Your cooperation with us is appreciated.

Sincerely,

s

.

i

Eldon J. Brunner, Chief

Reactor Operations and Nuclear

Support Branch

cc:

J. G. Herbein, Vice President-Nuclear Operations

R. J. Toole, Manager, Unit 1

W. E. Potts, Manager, Radiological Controls, Unit 1

J. J. Colitz, Manager, Plant Engineering, Unit 1

L. W. Harding, Supervisor of Licensing

R. F. Wilson, Director - Tecnnical Functions

E. G. Wallace, Licensing Manager

I. R. Finfrock, Jr.

R. W. Conrad

J. B. Lieberman, Esquire

Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment

G. F. Trowbridge, Esquire

'

,

8 0090 9 OM3h -

Q

.

.

.

.

- _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

'

  • -

.e-

,

,

, ,

,

Metropolitan Edi on Company

3

Post Office Box 480

-

Middletown, Pennsylvania 17057

717 944-4041

Writer's Direct Dial Number

9

July 16, 1980

TLL 339

Office of Inspection and Enforcement

Attn:

E. J. Brunner, Chief

Raactor Operations and Nuclear Support Branch

U. S. Nuclear Regulatory Commission

631 Park Avenue

King of Prussia, Pa.

19406

Dear Sir:

Three Mile Island Nuclear Station, Unit I (TMI-1)

Operating License No. DPR-50

Docket No. 50-289

Inspection Report 50-289/80-05

This letter is in response to Inspection Report 50-289/80-05 which contains

one apparent deviation.

Attached please find our response.

Sincerely,

e

/

-

J. G. Herbein

-

Vice President

TMI-I

JGH:DGM: hah

Attachment

ec:

B. H. Grier

'

R. W. Reid

B. J. Snyder

D. Dilanni

H. Silver

J. T. Collins

-

'

roc 42/D3c7 g

Metropohtan Edison Company is a Member of the Genera! Pubhc Utilities System

_

. _ . .

_

. _ _

_ . _ . . . , , _ . _ . . . . . . . . . -

.

~

-Attcchment 1

- g . ~ .x ,

-

TLL 339'

-

4%.

.

,

A

'

INSPECTION REPORT 50-289/80-05

fDeviation:

The RRR is a three volume document that had been submitted by the

' licensee to NRC-NRR describing the control and requirements to-be

imposed on Unit I restart activities. The inspectors noted that

in a number of instances.this document imposes requiremenes in addition

to those found in the QA Program and implementing procedures such

as GP-1008.'

.

The' inspector identified that those additional RRR requirements were

not included or referenced in any implementing instructions / procedures,

including engineering tasks assigned to the licensee's architect /

engineer (three specific examples are discussed in paragraphs 4.c and 5.b

of this report).

'

The failure to incorporate those additional requirements into

implementing instructions / procedures is considered to be a deviation

since the.RRR is a written commitment to the NRC (289/50-05-01).

Response:

1

The failure to' incorporate the additional RRR requirements into

. implementing instructions has been corrected by the issuance of the

GAI/GPUNC TMI Project Management Manual .rev. O dated 4/30/80 and

GPUNC ES-009.rev. 0 dated-7/8/80.

Paragraph 2:05 of TMI PMM directs

the project engineer to ensure that all GAI work is done in accordance

with RRR.

GPUNC ensures same by using the Verification Checklist in

ES-009.

,