ML19337A193
| ML19337A193 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/31/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19337A194 | List: |
| References | |
| NUDOCS 8009090237 | |
| Download: ML19337A193 (1) | |
See also: IR 05000289/1980005
Text
YH
u . W 'p
.
,
d
%c
UNITE 3 STATES
[,c
g
NUCLEAR REGULATORY COMMisslON
E
o
REGION I
U
if
s35 PARK AVENUE
g .,.
g
KING OP PRUS$1 A, PENNSYt.V AM A m06
.....
Docket No. 50-289
31 3 I 1989
Metropolitan Edison Company
ATTN: Mr. R. C. Arnold
Senior Vice President
100 Interpace Parkway
Parsippany.- New Jersey 07054
Gentlemen:
Subject: 50-289/80-05
This refers to the letter dated July 16, 1980, in response to our letter dated
4
June 12, 1980.
These actions were verified by our inspector as documented in IE Inspection
Report 50-289/80-16.
We have no further questions regarding your actions at
-
this time. Thank you for informing us of the corrective and preventive actions
documented in your letter.
-
Your cooperation with us is appreciated.
Sincerely,
s
.
i
Eldon J. Brunner, Chief
Reactor Operations and Nuclear
Support Branch
cc:
J. G. Herbein, Vice President-Nuclear Operations
R. J. Toole, Manager, Unit 1
W. E. Potts, Manager, Radiological Controls, Unit 1
J. J. Colitz, Manager, Plant Engineering, Unit 1
L. W. Harding, Supervisor of Licensing
R. F. Wilson, Director - Tecnnical Functions
E. G. Wallace, Licensing Manager
I. R. Finfrock, Jr.
R. W. Conrad
J. B. Lieberman, Esquire
Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment
G. F. Trowbridge, Esquire
'
,
8 0090 9 OM3h -
Q
.
.
.
.
- _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
'
- -
.e-
,
,
, ,
,
Metropolitan Edi on Company
3
Post Office Box 480
-
Middletown, Pennsylvania 17057
717 944-4041
Writer's Direct Dial Number
9
July 16, 1980
TLL 339
Office of Inspection and Enforcement
Attn:
E. J. Brunner, Chief
Raactor Operations and Nuclear Support Branch
U. S. Nuclear Regulatory Commission
631 Park Avenue
King of Prussia, Pa.
19406
Dear Sir:
Three Mile Island Nuclear Station, Unit I (TMI-1)
Operating License No. DPR-50
Docket No. 50-289
Inspection Report 50-289/80-05
This letter is in response to Inspection Report 50-289/80-05 which contains
one apparent deviation.
Attached please find our response.
Sincerely,
e
/
-
J. G. Herbein
-
Vice President
TMI-I
JGH:DGM: hah
Attachment
ec:
B. H. Grier
'
R. W. Reid
B. J. Snyder
D. Dilanni
H. Silver
J. T. Collins
-
'
roc 42/D3c7 g
Metropohtan Edison Company is a Member of the Genera! Pubhc Utilities System
_
. _ . .
_
. _ _
_ . _ . . . , , _ . _ . . . . . . . . . -
.
~
-Attcchment 1
- g . ~ .x ,
-
TLL 339'
-
4%.
.
,
A
'
INSPECTION REPORT 50-289/80-05
fDeviation:
The RRR is a three volume document that had been submitted by the
' licensee to NRC-NRR describing the control and requirements to-be
imposed on Unit I restart activities. The inspectors noted that
in a number of instances.this document imposes requiremenes in addition
to those found in the QA Program and implementing procedures such
as GP-1008.'
.
The' inspector identified that those additional RRR requirements were
not included or referenced in any implementing instructions / procedures,
including engineering tasks assigned to the licensee's architect /
engineer (three specific examples are discussed in paragraphs 4.c and 5.b
of this report).
'
The failure to incorporate those additional requirements into
implementing instructions / procedures is considered to be a deviation
since the.RRR is a written commitment to the NRC (289/50-05-01).
Response:
1
The failure to' incorporate the additional RRR requirements into
. implementing instructions has been corrected by the issuance of the
GAI/GPUNC TMI Project Management Manual .rev. O dated 4/30/80 and
GPUNC ES-009.rev. 0 dated-7/8/80.
Paragraph 2:05 of TMI PMM directs
the project engineer to ensure that all GAI work is done in accordance
with RRR.
GPUNC ensures same by using the Verification Checklist in
,
e
4
b
o
e