- pa arrog'o UNITED STATES 8
/o NUCLEAR REGULATORY COMMISSION g[E REGION lli i
799 ROOSEVELT ROAD
.g 4
e GLEN ELLYN,ILLINOls 60137 g
n MAY 15 ss0 State of Illinois Department of Public Health ATTN:
Mr. Gary N. Wright, Chief Division of Nuclear Safety 535 West Jefferson Street Springfield, IL 62761 Gentlemen:
The enclosed IE Bulletin No. 80-07, Supplement No. 1, titled "BWR Jet Pump Assembly Failure" was sent to the following licensees on May 13, 1980 for action:
Cincinnati Gas and Eletric Company Zimmer (50-358)
Cleveland Electric Illuminating Company Perry 1, 2 (50-440, 50-441)
Commonwealth Edison Company Dresden 2, 3 (50-237, 50-249)
La Salle 1, 2 (50-37't, 50-374)
Quad-Cities 1, 2 (50-254, 50-265)
Consumers Power Company Big Rock Point (50-155)
Dairyland Power Cooperative LACBWR (50-409)
Detroit Edison Company Fermi 2 (50-341)
Illinois Power Company Clinton 1, 2 (50-461, 50-462)
' Iowa Electric I.ight & Power Company Duane Arnold (50-331)
Northern Indiana Public Service Company Bailly (50-367) 80090 eo lI7
Q-
~
~ MAY 15 $80
' State of Illinois Northern States Power Company Monticello-(50-263)
Sincerely, A[&
Helen Pappas, Chief Admitistrative Branch
Enclosure:
IE Bulletin No. 80-07, Supplement No. 1 cc w/ enc 1:
Mr. D. W. Kane, Sargent & Lundy Central Files Reproduction Unit NRC 20b Local PDR NSIC TIC 1
l l
Ii; l 'n SSINS No.:
6820 Accession No.:
UNITED STATES 8005050055 i
NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 i
May 13, 1980 l
IE Bulletin No. 80-07 Supplement No. 1 BWR JET PUMP ASSEMBLY FAILURE
.C.
Reporting Requirements The information in Items A.3, and B.1, is requested under the provisions of 10 CFR 50.54(f).
Accord..; gly, you are requested to provide within the time periods specified in these items, written statements of this informa-i tion, signed under oath or aftirmation.
These reports should be submitted to the Director of the appropriate NRC Regional Office and a copy should be forwarded to the NRC Office of Inspection and Enforcement, Division of Reactor Operations Inspection, Washington, D.C.
20555.
Approved by GAO, B180225 (R0072); clearance expires 7-31-80.
Approval was given under a blanket clearance specifically for identified generic problems, t
t-
IE Bulletin No. 80-07 Enclosure g
Supplement No. 1 May 13, 1980 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.
80-13 Cracking In Core Spray 5/12/80 All BWR's with an Spargers OL 80-12 Decay Heat Removal System 5/9/80 Each PWR with an OL Operability 80-11 Masonry Wall Design 5/8/80 All power reactor facilities with an OL, except Trojan 80-10 Contamination of 5/6/80 All power reactor Nonradioactive System and facilities with an Resulting Potential for OL or CP Unmonitored, Uncontrolled Release to Environment 80-09 Hydramotor Actuator 4/17/80 All power reactor Deficiencies operating facilities and holders of power reactor construction permits 80-08 Examination of Containment 4/7/80 All power reactors with Liner Penetration Welds a CP and/or OL no later than April 7, 1980 80-07 BWR Jet Pump Assembly 4/4/80 All GE BWR-3 and Failure BWR-4 facilities with an OL 80-06 Engineered Safety Feature 3/13/80 All power reactor (ESF) Reset Controls facilities with an OL 80-05 Vacuum Condition Resulting 3/10/80 All PWR power reactor In Damage To Chemical Volume facilities holding Control System (CVCS) Holdup OLs and to those with Tanks a CP 79-01B Environmental Qualification 2/29/80 All power reactor of Class IE Equipment facilities with an OL 80-04 Analysis of a PWR Main 2/8/80 All PWR reactor facilities Steam Line Break With holding OLs and to those Continued Feedwater nearing licensing Addition T