See also: IR 05000302/1980030
Text
v
=
.
0
9m tar
4
UNITED STATES
?
8"
o,%
NUCLEAR REGULATORY COMMISSION
$
E
REGION 11
3 #
\\.....
101 MARIETTA ST., N.W.. SUITE 3100
ATLANTA. GEORGI A 3o303
In Reply Refer To:
RII: WAR
50-302/80-30
Florida Power Corporation
ATTN:
J. A. Hancock, Director
Nuclear Operations
P. O. Box 14042, Mail Stop C-4
St. Petersburg, FL 33733
)
Gentlemen:
This refers to the inspection conducted by W. A. Ruhlman of this office on
August 11 through 15, 1980 of activities authorized by NRC Operating License No.
DPR-72 for the Crystal River facility, and to the discussion of our findings
held with C. B. DuBois at the conclusion of the inspection.
This inspection was a comprehensive examination of your management and quality
assurance controls related to licensed activities. Inspection was conducted in
selected key areas of responsibility at both the plant site and the corporate
site. Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
Four new unresolved items resulted from this inspection and are discussed in the
enclosed report. These items will be examined during subsequent inspections.
A previously identified unresolved item involving training of noclicensed personnel
is discussed in paragraph 3.b.(4) of the enclosed report. It is our understanding
that actions needed to resolve this matter will be completed as described in para-
graph 3.b.(4). Please inform this office if your understanding is different from
that stated in the report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
s o 2033o[p
_
_
-_
-
.
. .
Florida Power Corporation
-2-
.
any information that you (or your centractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
nation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning th'.s letter, we will be glad to discuss
them with you.
Sincerely,
E C. E
R. C. Lewis, Acting Chief
l
Reactor Operations and Nuclear
'
Support Branch
!
l
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/80-30
cc w/ encl:
D. C. Poole, Nuclear Plant Manager
4