&g* "'%'o,*

.'

NUCLEAR REGULATORY COMMISSION

[C

M

3

UNITED STATES

7-

n

4

E~

REGION 11

Y

101 MARIETTA sT

N.W.. SUITE 3100

4

o

ATLANTA. GEORGIA 30303

.....

SEP 0 51980

In Reply Refer To:

RJIrJLS'

N

[5_0-395/80-18j

South Carolina Electric and Gas Company

ATTN:

T. C. ' Nichols, Jr. , Vice President

Power Production and Systems Operations

P. O. Box 764

-

Columbia, SC 29218

Gentlemen:

This refers to the inspection conducted by J. L. Skolds of this office on June 1 -

July 3,1980, of activities authorized by NRC Construction Permit No. CPPR-94 for

the V. C. Summer facility, and to the discussion of our findings held with 0. S.

Bradham at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

One new unresolved item resulted fror, this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

During this inspection it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A. Corrective actions to prevent recurrence were completed prior to

the conclusion of this inspection; therefore a reply is not requested.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

I

report contains any information that you (or your contractor) believe to be

)

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

j

8010230/03

--

--.

Q

.--.

-. - .

-

-

.

.

. .

.

M*.8h,

,.

L

FFD 0 51980

l*

. South Carolina Electric and

-2-

Gas Company

i

'

that proprietary information identified in the applicatior. is contained in a

separate part of-the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

l

Should you have any questions concerning this letter, we will be glad to discuss

j

them with you.

Sincerely,_

i

[.C.

R. C.

wis, Acting Chief

Reactor Operations and Nuclear

Support Branch

!

!

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-395/80-18

cc w/ encl:

i

(

A. A. Smith, Site QA Coordinator

l

T. B. Conners, Jr.

l

0. S. Bradham, Manager

Nuclear Operations

!

l

l

l