ML19336A430

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 800601-0703
ML19336A430
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/24/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19336A427 List:
References
50-395-80-18, NUDOCS 8010230109
Download: ML19336A430 (1)


Text

,

Y_)

APPENDIX A NOTICE OF VIOLATION South Carolina Electric and Gas Company License No. CPPR-94 V. C. Summer Nuclear Station Based on the NRC inspection June 1 - July 3,1980, certain of your activities were apparently not conducted-in full compliance with NRC requirements as indicated below.

These items have -been categorized as described in corre-spondence to you dated December 31, 1974.

As required by 10CFR50, Appendix B, Criterion V and as implemented by Section 17.1.5 of the FSAR " Activities affecting quality shall be

. prescribed by documented instructions, procedures or drawings... and shall be accomplished in accordance with these instructions, procedures and drawings."

Start Up Manual Procedure SUM B-8 " Conduct of Start Up Testing", Section 3.1 states that "An Official Test Copy of the approved test procedure will be followed in performing the test.

l l

Contrary to the above, on June 10, 1980, Dreoperational Test Procedure i

CS-7, Boric Acid Transfer System, Revision 2 was performed using a draf t l

copy of the procedure instead of the Official Test copy.

This is an infraction.

l l

l l

l l

8010230/8 l

..