ML19332G044
| ML19332G044 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/05/1989 |
| From: | Crlenjak R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8912200072 | |
| Download: ML19332G044 (1) | |
Text
._
OFFICIAL
{
o OEC 0 5-1989 i
r NOTICE OF SIGNIFICANT MFETING Name of Licensee:
Florida Power Corporation Name of Facility: Crystal River Docket No~.:
50-302 Date and Time of Meeting:
January 17, 1990, at 8:00 a.m.
Location of Meeting:
Crystal River Facility Purpose of Meeting: Management Meeting to discuss 1) Configuration Management;
- 2) Electrical Initiatives; and 3) Plans for the Upcoming Outage (Refuel 7).
NRC Attendees:
S. D. Ebneter, Regional Administrator, Region 11 (Rll)
L. A. Reyes, Director. Division of Reactor Projects (DRP), RII R. V. Crlenjak Chief, Reactor Projects Section 28. DRP, RII H. N. Berkow, Director Project Directorate 11-2, Office of Nuclear Reactor Regulation (NRR)
S. J. Vias, Project Engineer, DRP, RII P. Holmes-Ray, Senior Resident Inspector, NRC, RII H. Silver, Project Manager NRR Licensee Attendees:
P. M. Beard, Senior Vice President, Nuclear Operations B. Simpson, Director, Nuclear Engineering R. C. Widell, Director, Nuclear Operations Site Support NOTE: Attendance by NRC personnel at this NRC/ Licensee meeting should be made known by 2:00 p.m., January 5, 1990, via telephone call to S. Vias at FTS: 841-5350.
P Approved By:
Original signed by R. V. Crlenjak Chief Reactor Projects Section 28 Distribution:
J. M. Taylor, Acting EDO J. H. Sniezek, Deputy Director, NRR G. C. Lainas Assistant Director for Region 11 Reactors, NRR R. W. Borchardt, Regional Coordinator, E00 x
cc: NRC Resident Inspector NRC Attendees Document Control Desk
- Concurrences
?
- R
- DRP RidtDP RII:DRP RII:DRP RII:0RA 6
WV rip 6 4
SV as JCrienjak MSinkule LR es JMilhoan 1{/p/89 12/l/89 12/g /89 12/ /89 12/ /89 8912200072 091205 KDR ADDCKOSOOg2 7.Ek i
,