ML19332E959

From kanterella
Jump to navigation Jump to search
Confirms Dates of 891204-08 for Implementation of Reg Guide 1.97 Insp for Plant.Mgt Entrance & Exit Meetings Scheduled for 891204 & 08,respectively
ML19332E959
Person / Time
Site: Beaver Valley
Issue date: 11/30/1989
From: Hodges M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8912130198
Download: ML19332E959 (2)


Text

.

1; p, %.c 1

3:

y 4

NOV 3 01989 Docket Nos. 50-334 50-412 Duquesne Light Company ATTN: Mr. J. D. Sieber

-Vice President Nuclear Group Post Office Box 4 Shippingport,-Pennsylvania 15077 l

V

- Gentlemen:

Subject:

Implementation of Regulatory Guide 1.97.for Beaver Valley Units 1&2 (50-334/89-25,50-412/89-23)

This 1etter confirms the dates of December 4-8,1989 for the-Regulatory Guide.

' 1.97 inspection at Beaver. Valley Units 1&2. Our plans for this inspection.

,~

- were discussed with your staff durina a conference call between

- Mr. Frank Lipchick of your organizaNn and Mr. R. Paolino of the NRC Region I

. office. The-inspection will take place at the' Beaver Valley Site.in Shippingport,. Pennsylvania, b.

A management entrance meeting is scheduled for 1:00 p.m. on December 4, 1989.

The management exit meeting.is tentatively scheduled for December 8, 1989 at 11 : 00 - a.m.'

For this inspection we wi11' require the following:

1.

Calibration Records for Category 1,. type A, B and C variables 2.

Loop Diagrams: and Schematics K

3..

P& ids 4.

Power Source Diagrams 5.

Diagram of Control Room Panel.(location of instruments) 6.

EQ Master List Legend of Symbols / Abbreviations Used Status of-Standby Power j

The above information is to be made available at the inspection site on December 4, 1989.

We will require one copy of the Category 1, type A, B&C variables for Beaver

~

Valley Units 1&2 one week prior to the inspection.

d 0FFICIAL RECORD COPY ANDERSON 11/15/89 - 0001.0.0 l:4 8912130198 891130 I

Io 4

PDR ADOCK 05000334

. G.

PNU f f 6/

c

g g_

I p - g., y f %:

9' j

,Duquesne_ Light Company 2

0..

. NOV 0 0 1989

'four cooperation'with ut during this inspection will be appreciated. 'Should

.you have any questions'regarding the inspection, you can-contact Mr. : R.' Paolino (215-337-5285) or Mr. C. Anderson (215-337-5376).

Sincerely, OrJ ci:mi Signed By 4 Marvin W. Hodges, Director Division of Reactor Safety cc:

' S. Newberry, NRP.

4 i:

C. Anderson, DRS/RI

.cc w/ enc 1:

J. J. Carey, Executive-Vice President, Operations

.J..:0. C_rockett, General Manager, Corporate Nuclear Services W. S.ulacey, General Manager, Nuclear Operations

.N. R._-Tonet,. Manager,_ Nuclear Engineering

' T. P. Noonan, General Manager, Nuclear Operations S. C. Fenner, QA Manager K. D. Grada, Manager, Nuclear Safety l

H. R. Caldwell, General Superintendent, Nuclear Operations Public' Document Room (PDR)

Local. Public. Document Room (LPDR)

Nuclear Safety.Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

C. Cowgill, DRP P. Tam, NRR.

F

_PA0 (10)'SALP Reports Only J. Dyer, EDO c f0 RI:DRS

(

, RI:DRS Anderson /mlb/rw (Durr 11/N/89 1 /30/89 0FFICIAL RECORD COPY ANDERSON 11/15/89 - 0002.0.0 11/30/89 L

..