Text
cm g
y-
7
,
n
f
,(l
'
y
d--
r
j
.'
'
NOV 2 7.1989
lf~
50-412
Docket Nos. 50-334
.
4
'
Duquesne Light Company
?.
ATTN: Mr. J. D. Sieber
Vice President
.1
i
Nuclear Grou
' Post Office Box 4 p
l-
'
L
Shippingport, Pennsylvania 15077
Gentlemen:
-Subject:-Enforcement Conference Report No. 50-334/89-21
. An Enforcement Conference was held at the NRC Region I office on November.13,
<
1989, to discuss apparent violations and supervisory oversight weaknesses for
the secondary side steam generator. work conducted on September 28, 1989 at the
. Beaver Valley Unit I Power Station. These violations and supervisory oversight
weaknesses were discussed in NRC Combined Inspection Report Nos. 50-334/89-21;
'
isatfachedasEnclosure1.gnificantLicenseeMeeting
1989. A Notice of-Si
50-412/89-20, dated October 26
issued October. 27, 1989,
Topics discussed during the meeting and the meeting attendees are listed in the
attached Enforcement Conference Report, Enclosure 2. Your briefing agenda and
. handout material are attached with the Enforcement Conference Report. The two.
-
hour Enforcement Conference was held to give you the opportunity to indicate any
,
discrepant inspection findings and discuss short and long' term corrective-
actions for the apparent violations and supervisory oversight weaknesses.
Further. actions to be taken by the NRC, with respect to the apparent violations
and supervisory oversight weaknesses, will be the subject of separate
. correspondence.
Your cooperation with us is appreciated.
Sincerely,
cainal Saned By:
RozW R. Bonamy
Ronald R. Bellamy, Chief
Facilities Radiological Safety
and Safeguards Branch
Enclosures:
1.
Notice of Significant Licensee Meeting No.89-204
.'
2.
NRC Region I Enforcement Conference Report No: 50-334/89-21
}\\
- G912130025 89112"/
s: -
.2..
-
-
p p ya
i
goa
^ooca oso = 4
c .e.ca. iiu,cJ.a+ eur
s
1. ; >;>
g
., ,.
.
..
r<.
. _ . , . _ _
, . ~ . - - . . .
. - - - . .
. - -
,.
e ...
1
-..
.
'o
88
Duquesne Light Company
2
cc w/ encl'.
J. J. Carey, Executive Vice President, Operations
J. O. Crockett, General Manager, Corporate Nuclear Services
W. S. Lacey, General Mana er, Nuclear Operations
N. R. Tonet, Manager Nuc ear En ineering
T.P.Noonan,GeneralManager,NclearOperations
S. C. Fenner, QA Manager
K. D, Grada,-Manager Nuclear Safety
H. R. Caldwell, General Superintendent, Nuclear Operations.
Public Document Room (POR)
LPOR) (NSIC)
local Public Document Room
Nuclear Safet Information
enter
NRC Resident ns)ector
Commonwealth of 'ennsylvania
d
s y, On'. 9
e
3
. , , _ ,
y ,; t., l 3 s '* d
y,,
.
. . -
.
m-
1. - .
,1
ge n
.
. t.
.
,
ws
y
,
e
V::Q ,, f
-
,
,
NOV 2 71989 -
s
i
4
Duquesne Light Company.
3
'
,
t
I
bec w/ encl: .
Region I Docket Room (with concurrences)
i
Management Assistant,' DRMA (w/o encl)
,
-T. Martin RI.
W.Kane,ki-
.
E. Wenzinger, RI
C. Cowgill, DRP
R. Bellamy RI
W. Pasciak, R1
P.O'ConneII,RI
P. Tam hRR
.
,
Montedonner,SALPReportsOnly
D. Ho(lod)y, RISALP Reports Only
PA0 10
K. Christopher, RI
i
.
l
'
(Y'/
ri
)
.&
.O'Connell
Pa
ak
Bellamy
KW
11/<v/89'-
1If(0/89
11/t1/89
1)/ N89
~1.
'
or~i.,;ge, a;gpri? 0?i g"'
.1
r
,
gj
t. n s , s L' - -
.
. .
.
.
.
.
.
. _
, , .
.
_
.
_
.--
.
. .
_
-
.
,
'
!
g.T*1 y,; w .
Enclosure 1
' ,
'
'
>
-
a
7 4
'
OCT 2 71989 -
'
3
'
t
}
U.S. NUCLEAR REGULATOKY COMMISSION
No.89-174
1
s
h
REGION I
EA 89-204
NOTICE OF SIGNIFICANT LICENSEE MEETING
.
. Licensee:
Duquesne Light Company
'
Facility:.
Beaver Valley Power Station, Unit 1
.
'
Docket Nos.:
50-334
Time and Date:
10:30 a.m., Novemoer 13, 1989
..
Location:
DRSS Conference Room, Region I Office, King of Prustia, PA
L
'
Purpose:
Enforcement Conference regarding an inadequate survey
resulting in a substantial potential for an overexposure.
NRC Attendees:
W. Kane, Director, Division of aeactor Projects (DRP)
'
l
M. Kcapp, Director, Division of Radiation Safety and
l.
Safeguards (DRSS)
l=
R. Bellamy,' Chief, Facflities Radiological Safety and
'
Safeguard Branch, Division of Radiation Safety and
Safeguards (D.RSS)
[
W. Pasciak, Chief, Faci;ities Radition Protection Section,.
!
-DRSS
j;
R. O'Connell, Radiation. Specialist, DRSS
J. Joyner, Division Project Manager, DRSS
~
,
L
E. Wenzinger, Chief. Projects. Branch 4, DRP
C. Cowgill, Chief, Reactor Projects Section 4B
Licensee Attendees: J. Sieber, Vice President, Nuclear Group
S. Lacey, General Manager, Nuclear' Operations Servicest' ir
l '
J. Kosmal, Manager, Radiologic:a1 Control
3
K. Grada, Manager, Nuclear Safety
-
'
R. Vento, ALARA Engineer
.J. Sasala, Media Relations
Note: Attendance by NRC personnel at this meeting should be made known by
November 8, 1989 via telephone call to C. Cowgill, Region I, at
FTS'8-346-5128.
-
l.
-
l
Prepared by:
Curtis' J. Cg11, Chief, RPS 4B
Utn. u nsc o- J .
l
chio
--1
/ f
f
,
. . . - . .-
--
.-
..
. - .
-
-
--
- . - -
--
-