Advises That Action Re NRC Bulletin 88-010 Considered Complete & Closed Until Insp Identifies Deficiencies in Actions or 890330 & 1110 Responses
ML19332E391
Person / Time
Site: Pilgrim
Issue date: 12/04/1989
From: Mcdonald D
Office of Nuclear Reactor Regulation
To: Bird R
BOSTON EDISON CO.
References
IEB-88-010, IEB-88-10, TAC-71337, NUDOCS 8912070164
Download: ML19332E391 (3)


Text

_._

m.--..

.\\

. g*49 o. v*

E' NUCLEAR REGULATORY COMMISSION o

.l WASHINGTON, D. C. 20565 k, '.... /:

' December 4,1989 Docket'No. 50-293' Mr. Ralph G.~. Bird Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station

'RFD f1 Rocky Hill Road Plymouth, Massachusetts 02360

Dear Mr. Bird:

SilBJECT: NRC BULLETIN 88-10, SUPPLEMENT 1, "NON-CONFORMING MOLDED CASE CIPCUlT BREAKERS"

REFERENCE:

TAC NO. 71337 By letters dated March 30 and November 10, 1989, you provided responses to NRC

.Bulletin 88-10 and 88-10. Supplement 1, respectively. Your initial response stated that there are 978 molded case circuit breakers (CBs) stored-in the Pilgrim. warehouse.

Your review indicated there were no non-traceable molded case CBs. You further: indicated the documentation was being reviewed based on NRC clarification of verifiable traceability provided through NUMARC and would r

l submit the results of your effort at a later date.

l l

Your. November 10, 1989, response provided the results of your subsequent review and included consideration of the clarifications provided in Supplement l'

I to the Bulletin. A single molded case CB was' identified which was not traceable and, based on the clarification provided, did not require testing.

l:

.This was.the only CB procured under the purchese order and it will be retained for one year for future NRC/NUMARC evaluation. The CB is a spare for the H the existing CBs in-these systems were procured prior to Augus,/O p

l analyzers an4 t

of.1983..

i A detailed technical review of your responses has not been performed; however, your review may be subject to inspection at a later date.

If a subsequent inspection identifies deficiencies in your actions or responses, this issue will be reopened. We presently consider this action complete and are closing the above referenced TAC number.

fba 8912070164 891204 ADOCK 0500 g

.PDR O

-,*w-4 iww.91

--upte+w-

--wvvw adm-

  • -r-y w,- - ' - -

.ves-w w-v' W

--ee--i' y

w-

p; y-1 y

, W,r. Ralph G. Bird -

-2 December 4,1989 l

e i-i

' By copy of this letter, Region I is advised of your position on this matter.

Sincerely, Originalsigned by:

l Daniel G. Mcdonald, Senior Project Manager i

Project Directorate I-3 r

Division of Reactors Projects I/II Office of Nuclear Reactor Regulation j.s

[

cc: -See next page f

DISTRIBUTION

-N NRC PDR Local PDR PD1-3 Reading SVarga.

BBoger MRushbrook -

DMcDonald 0GC(f/infoonly)

EJordan ACRS(10)

JJoh

, RI LA M

-3/D MR rook D Donald:r ssman t

/89 l7/4/89 gi-/9/89 OFFICIAL' RECORD COPY

' Document Name: TAC 71337 t

l-

I-d i

.Mr. Ralph G. Bird CC:

Mr. K. L. Highfill Mr. Richard N. Swanson, Manager Vice President of Operations /

Nuclear Engineering Department and Station Boston Edison Company Pilgrim Nuclear Power Station 25 Braintree Hill Park RFD #1 Rocky Hill Road Braintree, Massachusetts 0?l84 Plymouth, Massachusetts 02360 Resident inspector.

Ms. Elaine D. Robinson i

U. S. Nuclear Regulatory Commission Nuclear Information Manager Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station Post Office Box 867 RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360 Plymouth, Massachusetts 02360 Chairman, Board of Selectmen Mr. Charles V. Barry 11 Lincoln Street Secretary of Public Safety Plymouth, Massachusetts 02360 Executive Office of Public Safety One Ashburton Place Office of the Comissioner Boston, Massachusetts 02108 Massachusetts Department of Environmental Quality Engineering One Winter Street Boston, Massachusetts 02108 Office of the Attorney General One Ashburton Place 20th Floor 1.

Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor

. Boston, Massachusetts 02111 l

Regional Administrator, Region i U. S. Nuclear Regulatory Comission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. John Dietrich Licensing Division Manager I

Boston Edison Company 25 Braintree Hill Park Braintree, Massachusetts 02184

..