ML19332D839

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 891001-31.Violation Noted: on 891029 & 30,only One Set of Emergency Diesel Generator Turbocharger Lube Oil Filters Were in Svc
ML19332D839
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/27/1989
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19332D836 List:
References
50-382-89-34, NUDOCS 8912050304
Download: ML19332D839 (1)


Text

.

m a g.

.g APPENDIX A NOTICE OF VIOLATION Louisiana Power & Light Company Docket:

50-382--

Waterford Steam Electric Station, Unit 3 Operating License:

NPF-38 During an NRC inspection conducted October 1-31, 1989, a violation of NRC requirements was identified.

The violation involved failure to comply with the emergency diesel generator surveillance procedure.

In accordance with the

" General Statement of Policy and Procedure for NRC Enforcement Actions,"

i 10 CFR Part ?, Appendix C (1989), the violation is listed below:

Failure to Folloe Procedure

. Technical Specification 6.8.Lc requires, in part, that written procedures shall be implemented for surveillance and test activities on safety-related equipment.

Operating Procedure OP-9-002, Revision 10. " Emergency Diesel Generator," (EDG) paragraph 5.1.10, requires verification that both sets of EDG turbocharger lube oil. filters are in service for the initial lineup.

3 Surveillance Procedure OP-903-069, Revision 7, " Integrated Emergency Diesel l

Generator / Engineered Safety Features Test," paragraph 5.6, requires the EDG to be aligned for " STANDBY" in accordance with OP-9-002 above.

Contrary to the above, on October 29 and 30, 1989, during the 24-hour run and subsequent loss of offsite power test of EDG B in accordance with paragraph 8.3.5 of OP-903-069, only one set of the EDG turbocharger lube oil filters was in service.

This is a Severity Level V violation.

(Supplement I) (50-382/8934-03)

Pursuant to the provisions of 10 CFR 2.201, Louisiana Power & Light Company is hereby required to submit to ti.is office, within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation:

(1) the reason for the violation if admitted, (2) the corrective steps which have been taken and the results achieved, (3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

Dated at Ar ington, Texas, this g day of h M 989 8912050304 891127 ADOCK 0500 g_,

PDR Q