ML19332C746
| ML19332C746 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 11/15/1989 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19332C740 | List: |
| References | |
| 50-334-89-18, 50-412-89-18, NUDOCS 8911280498 | |
| Download: ML19332C746 (1) | |
Text
p qqnww ?
-x
~
^
si;A.YM.,
..N t
'+
+
gv
%s- -
kj!j%? ' '
.n
~.
M ' m ~,;
W.
eu
+
4f'
$.t y
l
- y y,e
- APPENDIX A.
~~
a
~
NOTICE OF VIOLATION ru 4
- Duquesoe Light Company...
iBeaver: Valley;. Power. Station,cunit1&2.
Docket Nos 334 and 50-412
~.
License Nos. 0PR-66'and NPF-NPF-73' h
"y P Ea result of Lthe inspection conducted on MayL23 < July 7,' 1989, and.in-A
~
,;accordance.with the'" General-Statement of Policy and Procedure-for NRC Enforce-ment Actions,"'10.CFR.Part 2, Appendix C, the'.following violations were m
- identified:
A,
' Unit 21 Technical Specification G 2.2.f.b requires' that certain personnel 11ncluding1 reactor operators not work more than.72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any seven day:
. period,, excluding shift turnover time, unless authorized by the-' plant my manager or his designated alternate.
~
M
. Contrary to the above, during t_he: periods given below. three_ reactor-.
~
W
=
-operators worked more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />'in a'seven day period without authori zation:
.i March _18, 1989 to March 24,-1989 - Two operators exceeded the requi rement'.
nf May 5,-1989 to May 13,.1989 -;0ne operator. exceeded the requirement.
r iThis 1s a-Severity IV Violation-(Supplement 1).
i v.
,B!
LUnit 2 Technical.~ Specification 4.7.1.2.a.1.4 requires that constant n'
- communications' be' maintained between the control room and the auxiliary-feed; pump room while any normal discharge' valve is closed during surveil-g 11ance; testing.
Contrary to the-above, on October 5, 1989, constant communications:between L"
while the normal' discharge ~ valve to the steam driven auxiliary = feed pump J the; control room ~and the auxiliary feed pump room were not maintained-4 g
was shut'during surveillance testing.
l
'This is a Severity IV Violation (Supplement 1).
o
. Pursuant to the provisions.of 10-CFR 2.201, Duquesne Light Company is I
[
hereby required to submit to this office within thirty days of the date of 9'
'the letter which. transmitted this Notice, a written statement or explana-L tion in reply, including: (1) the corrective steps which have been taken Land tha results achieved;. (2) corrective steps which will be taken to E~
avoid further violations; and (3) the date when full compliance will be achieved. where good cause is shown, consideration will be given to gg " '