Notice of Violation from Insp on 890523-0707.Violation Noted:Three Reactor Operators Worked More than 72 H in 7 Day Period W/O Authorization & Constant Communications Between Control & Auxiliary Feed Pump Rooms Not Maintained
ML19332C746
Person / Time
Site: Beaver Valley
Issue date: 11/15/1989
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19332C740 List:
References
50-334-89-18, 50-412-89-18, NUDOCS 8911280498
Download: ML19332C746 (1)


Text

p qqnww ?

-x

~

^

si;A.YM.,

..N t

'+

+

gv

%s- -

kj!j%? ' '

.n

~.

M ' m ~,;

W.

eu

+

4f'

$.t y

l

y y,e
APPENDIX A.

~~

a

~

NOTICE OF VIOLATION ru 4

Duquesoe Light Company...

iBeaver: Valley;. Power. Station,cunit1&2.

Docket Nos 334 and 50-412

~.

License Nos. 0PR-66'and NPF-NPF-73' h

"y P Ea result of Lthe inspection conducted on MayL23 < July 7,' 1989, and.in-A

~

,;accordance.with the'" General-Statement of Policy and Procedure-for NRC Enforce-ment Actions,"'10.CFR.Part 2, Appendix C, the'.following violations were m

identified:

A,

' Unit 21 Technical Specification G 2.2.f.b requires' that certain personnel 11ncluding1 reactor operators not work more than.72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any seven day:

. period,, excluding shift turnover time, unless authorized by the-' plant my manager or his designated alternate.

~

M

. Contrary to the above, during t_he: periods given below. three_ reactor-.

~

W

=

-operators worked more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />'in a'seven day period without authori zation:

.i March _18, 1989 to March 24,-1989 - Two operators exceeded the requi rement'.

nf May 5,-1989 to May 13,.1989 -;0ne operator. exceeded the requirement.

r iThis 1s a-Severity IV Violation-(Supplement 1).

i v.

,B!

LUnit 2 Technical.~ Specification 4.7.1.2.a.1.4 requires that constant n'

- communications' be' maintained between the control room and the auxiliary-feed; pump room while any normal discharge' valve is closed during surveil-g 11ance; testing.

Contrary to the-above, on October 5, 1989, constant communications:between L"

while the normal' discharge ~ valve to the steam driven auxiliary = feed pump J the; control room ~and the auxiliary feed pump room were not maintained-4 g

was shut'during surveillance testing.

l

'This is a Severity IV Violation (Supplement 1).

o

. Pursuant to the provisions.of 10-CFR 2.201, Duquesne Light Company is I

[

hereby required to submit to this office within thirty days of the date of 9'

'the letter which. transmitted this Notice, a written statement or explana-L tion in reply, including: (1) the corrective steps which have been taken Land tha results achieved;. (2) corrective steps which will be taken to E~

avoid further violations; and (3) the date when full compliance will be achieved. where good cause is shown, consideration will be given to gg " '

extending this response time.