Text
.
! /(
c
.
'
UNITED STATES
f "< %q'g
NUCt EAR REGULATORY COMMISSION
/
f A
- /
REoloN IV
7 '
' i. %b
611 RY AN Pt.AZA DRIVE, SUITE 1000
d
ARLINGTON, TEX AS 76012
hs, f
7
g.-
o\\n ~ *' f
August 8, 1980
- .,=
Docket Nos.
50-313/80-11
50-368/80-11
Arkansas Power and Light Company
Attn: Mr. William Cavanaugh III
Vice President of Generation
and Construction
P. O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted under the Resident Inspection Program
by Messrs. W. D. Johnson and L. J. Callan, of this office, covering the period
of June 22 through July 21, 1980, of activities authorized by NRC Facility
Operating License No. DPR-51 and NPF-6 of the Arkansas Nuclear One, Units 1
and 2, and to the discussion of the findings by the inspectors with members
of your staff at the conclusion of each segment of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspectors.
During this inspection it was found that certain of your activities were not
conducted in full compliance with NRC requirements, as set forth in the Notices
of Violation, enclosed herewith as Enclosures (1) and (2).
These notices are
sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your recipet of these
notices, a written statement or explanation reply including:
(1)
corrective
steps which have been taken by you, and the results achieved; (2)
corrective
steps which will be taken to avoid further noncompliance; and (3)
the date
when full compliance will be achieved.
During this inspection it was also found that one of your activities appeared
to deviate from one of your written commitments to the Commission.
This item
and reference to the specific commitment are listed in the Notice of Deviation,
enclosed herewith as Enclosure (3).
In response to this item, please comment
on actions taken to correct the deviation or make commitments concerning
corrective action planned or initiated.
8000180
'
_
4 70
.
7 .-
,-
.
Arkansas Power and Light Company
2
August 8,1980
In accordancs with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Coie of Federal Regulations, a copy of this letter and the enclosed
inspection report, except for Enclosure (2) and Attachment A to the inspection
report, will be placed in the NRC's Public Document Room.
If the report con-
tains any information that you believe to be proprietary, it is necessary that
you submit a written application to this office within 20 days of the date of
this letter, requesting that such information be withheld from public disclosure.
This application must include a full statement of the reasons why it i- claimed
that.the information is proprietary. The application should be prepa:ed so
that any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will be placed
in the Public Document Room. If we do not hear from you in this regard within
the specified period, the report, with the exceptions noted above, will be
placed in the Public Document Room.
' Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
7- Edb /~
G. L. Madsen, Chief
Reactor Operations and
Nuclear Support Branch
,
Enclosures:
1.
Notice of Violation (Unit 2)
2.
Notice of Violation (Units 1 and 2) (Contains 10 CFR 2.790(d) information)
3.
Noti;e of Deviation (Unit 2)
4.
IE Inspection Report Nos. 50-313/80-11
50-368/80-11
cc: w/ enclosures
Arkansas Nuclear One
Attn:
J. P. O'Hanlon, General Manager
P. O. Box 608
'Russellville, Arkansas 72801
1
y