ML19332A759

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1980
ML19332A759
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/10/1980
From: Underwood P
GEORGIA POWER CO.
To:
Shared Package
ML19332A760 List:
References
NUDOCS 8009180235
Download: ML19332A759 (9)


Text

. . .

~

OPERATING DATA REPORT ,s

"' DOCKET NO. 50-366 DATE 9-10-80 COMPLETED BY P. R. Underwood TELEPHONE 912-Jo/-//81

' OPERATING STATUS

1. Unit Name: Hatch 2 N'
2. Reporting Period: 8-80
3. Licensed Therms! Power (MWr): 2436
4. Nameplate Rating (Gross MWe): EI7 0 -

S. Design Electrical Rating (Net MWe): 784.0

6. Maximum Dependable Capacity (Gross atWe): 805.7
7. Maximum Dependable Capacity (Net MWe): 772 7
8. If Changes Occur in Capacity Ratings (!! ems Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr.-to Date Cumulative II. Hours In Reporting Period 744 8;R88 8688

12. Number Of Hours Reactor Was Critical 731.6 4189.9 6853.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On Line 722.5 3937.4 6351.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Grom Thermal Energy Genersted (MWH) 1625414 8639094 14133156 T
17. Gross Electrical Energy Genersted (MWH) 533900 ., 2866730 4702690 '
18. Net Electrical Energy Generated (MWH) 510506 2730439 4487576
19. Unit Servics Factor 97.1 67.2 73.1 -
20. Unit Availability Factor 97.1 67.2 73.1 -
21. Unit Capacity Fsetor iUsing MDC Net) 88.8 60.4 66.8
22. Unit Capacity Factor (Uning DER Net) 87.5 59.5 65.9
23. Unit Forced Outage Rate 2.9 13.5 12.4 ,
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Eachi: .
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status iPrior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION 800gygg pg _ - _ .. -_ _ . _ _ _ .

- ^

  • AVERAGE DAILY UNIT POWER LEVEL l l

DOCKET NO. 50-366 1 UNIT Hatch 2 DATE 9-10-80 COMPLETED BY P R, underwood.

~

TELEPHONE 912-367-7781 MONTH 8-80 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) - .

(MWe Net)

-3 17 727 1

2 532 gg 7qs 3 633 39 754 4 744 20 753 5 742 21 756 6 739 -

22 753 7 748 23 404 3 747 24 518 9 712 25 714 10 759 26 765 It 701 27 761

  • 12 767 23 763 13 754 29 764 14 76I 30 764 15 747 31 764 16 CAA 5

INSTRUCTIONS On this format. list the average daily unit power levelin MWe-Net for each day in the reporting month Comput the nearest whole megswatt. '

f (W771

, . - - - - - , . -.. , . - - . , - , a , , , - , , , . , .n.,,,n,.. ,,_n . - , - , c.,,. , , -n s,,-

. r -

n .

.m .

DOCKET NO. 50-366

\ UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME ilarch 9

. DATE 9-10-80 .

O 8-80 COMPLETED BY P R IIndan.nna REPORT MON.ill TELEPilONE 912-367-7761 De) , .

z9 -

q Me) --

g .jj T j. Licensee E ,,

. Cause & Cossective No. Date

[ Event u Action su

[}

g3 , , a:

N oE a. j di Repost # A} . Prennt Recurrence w -

b j , ,', 80-26 800801 F 21.53 B 2 NA - IC ACCUMU Rx manual scram per IEB 80-17 SDV an-lysis proved satisfactory 80,27 800801 F 19.47 8 5 NA IC ACCUMU Unit on startup ramp from aljove shut- '

down"#80-26 ,

80-28 800003 F 15.62 B 5 'NA. IlC llTEXCH Reduced load in order to adjust 4th and 6th stage feedwater. heater level

! .. controllers -

s l .

80-29 800808 F 5.5 B 5 NA ilE TURBIN Reduced load in order to perform week-ly turbine test '

80-30 800811

  • F 4.25 A 5 80-120 CB PUMPXX 8 2B recirc pump.MG set trip on low oil -

pressure reduced load to reduced speed i ,.

on 2A recirc pump

  • 1 -

l '1 2 -

3 4 4

F: Forced Reason: hiethod: Exhibit G Insasuctions . .

5: Scheduled A Equipment Failure (Explain) l klanual for Pseparation of Data l Il ht.iinienance ci Test 2 klanual Scram. Entry Sheet: for Licemee C Hefueling l

3-Automatic Scrain. Event Report (LER) File (NUREG-  :
D. Regulatory Resirlction 4 Other(Explain) 0161)

~  :

E Operator Training & License Examination i i F Administrative 3 i G Operational Ensus (Emplain) Exhible I Same Source ,

(9/77) . Ilosher(Emplain)

  • 2 .

.g l j .

- -- .. - - . . - ~ ~ . - - . ~ . - _ _ - _

r O.

)0 R

. UNIT SilUIDOWNS AND POWER REDUCTIONS KE

, N Ha h b DATE E

9-10-80

  1. .
  • COMPLETED sy P_ R lindorunnd REPORT MONfit R-RO TELErilONE 917-367-7781 3

,@ ' i N

C m

  • [Uh j  !. I

- E- 3 s Licensee Ev g

. Cause & Currecilve I

'Ih Ei Nii. Dale k i 3 's M Event Ateloniu

C H

$$ A j di Report # Au . Psevent Recurrence 80-31 26.38

.. 800815 F A 5 80 123 . CE VALVES Reduced load to repair torque switch .

on E51-F008 valve in RCIC system  :

80-32 800823 F 2 . D 5 NA HE TURBIN Reduced load in order to perform i e

! weekly turbine test .

80-33 l-900823 F 46.25 0 5 NA RB CONROD Reduced load in orddr to perform j a rod sequence exchange  !

i l

\

  • i, e  !.

. i.

1 2 -

3 . 4 F: Forced Reason: Method:

Exhibit G-Instructions S
Scheduled 'A 1:: uipmens Failure (Explain) 1. Manual for Prepasation of Data
li. Maintenance ci Test 2 Manual Scram. Enity Sheets for tiensee -

l C-Refueling D.Regulatosy Resisiction

3. Automatic Scrasn.

4-Other (Explain)

Event Reposs (LER) File INUREG-0161) l1 j E Operator Training & l.icense Examinallon

F. Administrative 5 -

i, G-Opesational Earor (Explain) Exhibit I Same Source -

l (9/17) li-Other(Explain)

  • I

. I

NARRATIVE REPORT UNIT 2 August 1st Continuation of 80-26 August 1st Startup from above shutdown Rx critical at 12:26 and generator on line at 21:32. Unit returne.d to rated conditions at 17:00 on 8-2-80 August 3rd Reduced load in order to adjust 4th and 6th stage feedwater heater level controllers August 8th Reduced load in order to perform weekly turbine test. Unit returned to rated conditions at 5:00 on 8-9-80.

August lith At 1013, 2B recire pump MG set tripped. Reduced load to reduce speed of 2A recire pump to 2B recire pump could be returned to operation.

August 15th Reduced load in order to repair torque limit switch on valve E51-F008, in RCIC system. Unit returned to rated condition at 2:00 on 8-17-80.

August 23rd Reduced load in order to perform weekly turbine test August 23rd Reduced load in order to perform a rod sequence exchange. Unit returned to rated conditions at 5:15 on 8-25-80.

There was no single release of radioactivity or single radiation exposure which accounts for more than 10% of the allowable annual values during August of 1980.

um a

~

t HATCH 2 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR JULY 1980 NUMBER DATE COMPLETED DESCRIPTION 50-3055 7-30-80 Replaced CRD scram discharge level switch with new SDL switch SN 681584 80-3056 7-30-80 Replaced CRD scran discharge level switch with new SDL switch, SN681585 80-3202 8-10-80 Adjusted limit switch on air inlet valve for 2A RWCU demin 80-3157 8-5-80 Replaced alarm card on annun "MSIV seal system valve overload inboard" BO-3221 8-13-80 LPRM 44-29C swapped amp and range cards 80-3181 8-12-80 Torus level / press r e c o r d e.r ,

filled reference leg on 2T48-N021A 80-3114 8-14-80 Calibrated transducer and exciter

' demodulation on centrifuge torque recorder 80-3109 8-12-80 Replaced point card on emergency seal oil pump overload alarm 80-3099 8-12-80 Replaced point card on tank water detector alarm 80-2872 7-30-80 Replaced handwheel bushing on BWRT transfer pump manual discharge valve 80-2879 7-30-80 Replaced front sectionr of "in-service mods switch" on radwaste filter control panel, P001-1 80-2809 7-30-80 Disassembled and cleaned A & 3 CBWRT transfer pump discharge check valves 80-1981 7-29-80 Repaired welds on junction box support e- --

w ,-

1-

+

80-2996 8-6-80 Drywell/ torus vacuum breakers found air supply line broken, replaced air line with new turbine 80-2558 8-6-80 Torus to drywell vacuum breaker air supply line broken, replaced with. new tubing and welded line in place 1

3086 8-3-80 Primary containment feedwater isolation check valve stem was lubricated 4

80-2950 8-3-80 Repaired broken wire on coMrol rod posi tion display 80-2995 8-3-80 Calibrated SBLC discharge pressure guage 80-2898 8-2-80 Repaired and adjusted temperature recorder 80-2784 8-2-80 Found wires pressing against Bordon tube; repaired .and reclaibrated 80-2588 8-2-80 Adjusted RBM B's power supply, RBM B would not " set up" properly 80-3090 8-2-80 Replaced and adjusted limit

- switch on RHR testable check disc positioner ,

80-3123 8-1-80 Repaired relay C71-K22B 80-2560 8-1-80 Repaired and cleaned flow elements E32-N006B, K, F, P; also recalibrated their corresponding transmitters 80-2204 7-30-80 Replaced ASCO solenoid valve

, because old valve was stuck 80-2957 8-7-80 Adjusted torque switches and lubricated stem and cycled valve

, ope'n and closed on main steam line drain MOV S0-2422 8-1-80 Adjusted torque switch on main steam line drain valve (steam tunnel)

I 80-3061 7-30-80 Replaced broken valve and solenoid on RHR loop "A" discharge check valve 0

a, e p , --r s , , , , , -a-,-., a v,+w- p

80-2179 8,-3-80 Inlet valve to RBCCW heat exchanger, replaced switch and switch housing, then adjusted switches 80-2712 8-2-80 Adjusted positioner on steam seal feed valve regulator 80-3077 7-30-80 Removed insulation and opened shield doors for QC inspection of sacrificial shield doors around "B" recire line 80-2616 7-30-80 Calibrated switch on diesel gen.

air compressor 80-3065 7-30-80 Replaced cracked airline for drywell to torus vacuum breakers 2T48-F323D 80-3060 7-30-80 Replaced air control valves on all vacuum breakers for drywell to torus vacuum breakers 2T48-F323 A-L 80-1575 7-30-80 Adjusted stroke on valve for PSW outlet from 2C d/g 80-2137 7-30-80 Adjusted torque switch on RHR s/d cooling suction MOV l- 80-2990 7-30-80 In test status alarm / Unit 2 control room; replaced point card and checked 80-2576 7-30-80 Replaced voltage preamp for IRM F 80-2813 7-29-80 Replaced pivot wheel assembly on multipoint vent temp recorder on 2Hil-P654 panel 80-2831 7-29-80 Replaced voltage re-amp and high voltage power supply on "F" IRM 80-3002 _

8-2-80 Replaced drive card on condensate

?

demineralizer conductivity chart recorder '

80-2994 8-3-80 Adjusted air control valve on "I" drywell to torus vacuue. BKR 80-3066 8-3-80 Cleaned and repaired solenoid valve on 2B21-F076B i

0 e w -- , ,e- . .-- = -

e

t h

++. ,MAeE EvA<o 1,em TEST TARGET (MT-3)

.'+o L

E EE g , 62$

1.l ,Ejm EB 3

1.25 IA_

j i.6 c 6" MICROCOPY RESOLUTION TEST CHART i

  1. 4 ' ++4 %

YN exxzzz 4_  : M<g;}

, .t 1 t

~~~

di;w;g;;.2._aa _ -- --

e q

9

. 9+f>4>e% '*

, eEEv <eA1,em

$<#h TEST TARGET (MT-3) 4 1.0 d[24 BM n5 m na En l,l f

  • bN 11

'I.25 1.4 1.6

== __

,=

V MICROCOPY RESOLUTION TEST CHART ,

  1. 4 -
  • $ff 4Inr <r  :

k<$

=:w L

t.

l- 80-2368 7-30-80 Adjusted limit switches on 2E41-F00~, HPCI test line MOV 80-2586 7-30-80 Examined valve on main steam supply to reheater, 2N11-F004 80-3180 8-15-80 Calibrated offgas H2 analyzer 2B recorder 80-3204 8-15-80 Replaced lundell point card on "MSIV seal system for air flow inboard" sununciator 80-3215 8-15-80 calibrated the 8th stage ext, steam recorder, 2N36-R604 80-3050 3-15-80 Calibrated reverse power relay 2R43-K767 on 2C diesel gen 80-3217 8-17-80 Replaced bad motor on HPCI suction valve from torus 80-3333 8-21-80 Repaired bad wire on d/w pressure and torus level recorder 80-3339 8-22-80 Replaced needle valves on accumulators 80-3289 8-20-80 Multipoint temp recorder, replaced chart drive motor 80-3250 8-20-80 Replaced torque switch on RCIC isolation valve outboard 80-3267 8-20-80' Cleaned discharge check valve on CBWRT tran pump 2A 80-3163 8-15-80 CBWRT transfer pump suction replaced bad coil on valve-4 e

.. ,- _