Forwards IE Insp Repts 50-413/80-13 & 50-414/80-13 on 800618-20.No Noncompliance Noted
ML19332A301
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/23/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19332A299 List:
References
NUDOCS 8009110425
Download: ML19332A301 (2)


See also: IR 05000413/1980013

Text

eo.

p

.

o

UNITED STATES

.

8

NUCLEAR REGULATORY COMMISSION

~

o

1

3

9

REGION li

p,

101 MARIETTA ST

N.W.. SUITE 3100

4

ATLANTA, GEORGIA 30303

'

g*****

o

JUL 2 31939

.

In Reply Refer To:

~

RII:VLB

50-413/80-13

,

50-414/80-13'

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by V. L. Brownlee of this office on

June 18 through 20, 1980 of activities authorized by NRC Construction Permit

Nos. CPPR-116 and CPPR-117 for the Catawba Nuclear Power Station facility, and

to the discussion of our findings held with D. G. Beam at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

,

9

. E. Murphy," Chief

Rm etor Construction and Engineering

Support Branch

l

Enclosure:

See Page 2

.R009110-T?

,

. .

.

. - .

.

- .

.

..

.

.

Duke Power Company-

- -2-:-

. . -g

,

JUL. 2 31980

Enclosure:

-

Inspection Report Nos. 50-413/80-13-

and 50-414/80-13:

cc w/ enc 1:

-*

~J. W. Hampton, Station Manager

. D. G.' Beam, Project Manager

.

-

O-

b

4

a

.

j

.

.

i.

k

,

i

7-

.

-. ,

a

C-9,

.--

g

,_,e..,,.9..-

, y. p.,

g.,

,

..,_py.

,.,y...,

,%,,,

, , , ,

,.,,,_,7,

. , , _ h y. ..

.

...gy,,_..,,_,,,,,ym,

_m,,,y,,.7.,,.,,,,,.y,

.,,my,,7,

_,,,.,,