ML19332A301
| ML19332A301 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/23/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19332A299 | List: |
| References | |
| NUDOCS 8009110425 | |
| Download: ML19332A301 (2) | |
See also: IR 05000413/1980013
Text
eo.
p
.
o
UNITED STATES
.
8
NUCLEAR REGULATORY COMMISSION
~
o
1
3
9
REGION li
p,
101 MARIETTA ST
N.W.. SUITE 3100
4
ATLANTA, GEORGIA 30303
'
g*****
o
JUL 2 31939
.
In Reply Refer To:
~
RII:VLB
50-413/80-13
,
50-414/80-13'
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by V. L. Brownlee of this office on
June 18 through 20, 1980 of activities authorized by NRC Construction Permit
Nos. CPPR-116 and CPPR-117 for the Catawba Nuclear Power Station facility, and
to the discussion of our findings held with D. G. Beam at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
,
9
. E. Murphy," Chief
Rm etor Construction and Engineering
Support Branch
l
Enclosure:
See Page 2
.R009110-T?
,
. .
.
. - .
.
- .
.
..
.
.
Duke Power Company-
- -2-:-
. . -g
,
JUL. 2 31980
Enclosure:
-
Inspection Report Nos. 50-413/80-13-
and 50-414/80-13:
cc w/ enc 1:
-*
~J. W. Hampton, Station Manager
. D. G.' Beam, Project Manager
.
-
O-
b
4
a
.
j
.
.
i.
k
,
i
7-
.
-. ,
a
C-9,
.--
g
,_,e..,,.9..-
, y. p.,
g.,
,
..,_py.
,.,y...,
,%,,,
, , , ,
,.,,,_,7,
. , , _ h y. ..
.
...gy,,_..,,_,,,,,ym,
_m,,,y,,.7.,,.,,,,,.y,
.,,my,,7,
_,,,.,,