ML19332A147
| ML19332A147 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 07/23/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Andognini G BOSTON EDISON CO. |
| Shared Package | |
| ML19332A148 | List: |
| References | |
| NUDOCS 8009100874 | |
| Download: ML19332A147 (2) | |
See also: IR 05000293/1980021
Text
y
- *n arrog
fp
UNITED STATES
,og
[.
g
NUCLEAR REGULATORY COMMISSION
L
j
REGION I
8,
631 PARK AVENUE
g,#
$
KING oF PRUSSIA, PENNSYLVANIA 19406
9
D:cket No. 50-293
JUL 2 31980
Boston Edison Company M/C Nuclear
ATTN:
Mr. G. Carl Andognini, Manager
Nuclear Operations Department
800 Boylston Street
Boston, Massachusetts
02199
Gentlemen:
Subject:
Inspection No. 50-293/80-21
This refers to-the routine inspection conducted by Mr. Raymond and others of
this office on May 4-16, and May 28-30, 1980, of activities authorized by NRC
License No. DPR-35 and to the discussions of our findings held by Mr. K. P.
Roberts with Mr. R. Machon at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of elective examinations of procedures
and representative records, interviews wich personnel, and observations by the
inspector.
.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contract 1r) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must be accompanied by an affidavit executed by the owner of the
information, which identifies the document or part sought to be withheld, and
which contains a statement of reasons which addresses with specificity the
items which will be considered by the Commission as listed in subparagraph (b)
(4) of Section 2.790.
The information sought to be withheld shall be incorpo-
rated as far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report will be
placed in the Public Document Room.
l
l
l
l
,
800910,0M7p
l
.
_
__
.
.
JUL 2 3 1980
Boston Edison Company
2
No reply to this letter is required; however, ff you should have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
i(
_
,
El
n J.% runner, Chief
Reac or Operations and Nuclear
Su ort Branch
Enclosure:
Office of Inspection and Enforcement
Inspection Report No. 50-293/80-21
cc w/ enc 1:
P. J. McGuire, Pilgrim Station Manager
,
l
l
.