Text
_ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
[jD
o
e
UNITED STATES
/faREcq%,
NUCLEAR REGULATORY COMMISSION
t' 'n
REGION IV
,
7 I ' ~ ' ' '
o
611 RY AN PLAZA DRIVE, SUITE 1000
7e .
j
ARLINGTON, TEXAS 76012
o
a
% .%......f
July 31, 1980
In Reply Refer To:
RIV
Docket No. 50-445/Rpt. 80-17
-
50-446/Rpt. 80-17
.
Texas Utilities Generating Company
ATTN:' Mr.
R-.
J. Gary, Executive- Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas
75201
Gentlemen:
This refers to ' ae inspection by Messrs. L. E. Martin and L. D. Gilbert of
our staff during the period July 14-18, 1980, of activities authorized by
NRC Construction Permits. No. CPPR-126 and 127 for the - Comanche Peak facility,
Units No.1 and 2, and to the discussion of our findings with Mr. R. G. Tolson
and other members of your staff at the conclusion of the inspection.
Areas exanined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with Appendix B to 10 CFR 50 of the NRC
Regulations, " Quality Assurance Criteria for Nuclear Power Plants." The item
of noncompliance and references to the pertinent requirenents are identified in
the enclosed Notice of Violation.
This notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 30 days of your
receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which havc been taken is, vet' , and the results achieved;
(2) corrective steps which will be taken to avou further noncompliance; and
(3) the date when full compliance will be achieved.
.
- 8'009100 /(f
.
.
.
.
Texas Utilities Generating Company
-2-
July 31, 1980
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If the
report contains any information that you believe to be proprietary, it is
~
necessary that you submit a writta a application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure. The application must include a full statement of the reasons
why-it is claimed that the information is proprietary. The application shocid
be. prepared so that any proprietary information identified is contained in an. --
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will ba placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
.
[h
'
W. C. Seidle Chief
Reactor Construction and
.
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
IE Inspection Report No.' 50-445/80-17
50-446/80-17
cc: w/ enclosures-
Texas Utilities Generating Company
Attn:
Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas
75201