o
UNITED STATES
!Q
P
NUCLEAR REGULATORY COMMISSION
n
{ 4-
a e
REGION 111
,
'
s
799 ROOSEVELT ROAD
GLEN ELLYN. ILLINOIS 60137
.....
'JUL
9 1980
Docket No. 50-440
The Cleveland Electric Illuminating
Company
ATTN: Dalwyn R. Davidson
Vice President - System
Engineering and Construction
Post Office Box 5000
Cleveland, OH 44101
Gentlemen:
This refe;; to the inspection conducted by Mr. E. W. K. Lee of this office
on June 25-27, 1980, of activities at the Perry Nuclear Plant Project Unit 1
authorized by NRC Construction Permit No. CPPR-148 and to the discussion of
our findings with Mr. M. Edelman and others of your staff at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and inter-
views with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201 of
the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office within thirty
days of your receipt of this notice a written statement or explanation in
reply, including for each item of noncompliance: (1) corrective action taken
and the results achieved; (2) corrective action to be taken to avoid further
noncompliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,
and your response to this letter will be placed in the NRC's Public Document
Room, except as follows.
If the enclosures contain information that you or
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty days of your receipt of this letter, to withhold
such information from public disclosure. The application must include a
full stetement of the reasons for which the information is considered pro-
prietary, and should be prepared so that proprietary information identified
in the application is contained in an enclosure to the application.
80091005
e
VL
9 E001
'
The Cleveland Electric
-2-
Illuminating Company
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
-
t
p tid &
G.
iorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspe-ction Report
No. 50-440/80-10
cc w/encls:
Central Files
Reproduction Unit NRC 20b
Local PDR
'
Harold W. Kohn, Power Siting
Commission
Mr. Daniel D. Wilt, Attorney
Helen W. Evans, State of Ohio
.