Forwards Safety Evaluation Re Facility Steam Generator Tube Degradation.Based on Review of Util Steam Generator Tube Insp,Unnecessary to Place Further Restriction on Resumption of Facility Operation
ML19331D930
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 08/08/1980
From: Case E
Office of Nuclear Reactor Regulation
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19331D931 List:
References
NUDOCS 8009040299
Download: ML19331D930 (9)


Text

.5, fi[/ff

/

UNITED STATES E

NUCLEAR REGULATORY COMMISSION o

r, j

wAsmNGTON, D. C. 20555

  • g At 3st 8, 1980 Docket No. 50-266 Mr. Sol Burstein Executive Vice President Wisconsin Electric Power Company 231 West Michigan Street Milwaukee.. Wisconsin 53201

Dear Mr. Burstein:

The NRC staff has reviewed the results of the Point Beach Nuclear Plant, Unit No. 1,' steam generator tubes inspection which :sas submitted by letter dated August 5,1980 in accordance with the April 4.,1980 Modification of November 30, 1979 Order. Based on the results of that review and for the reasons stated in the attached Safety Evaluation Report, we find that the results are acceptable and, thus, it is not necessary to place any further restriction on the resumption of operation of the Point Beach Nuclear Plant, Unit No. 1.

We would like to emphasize that all the conditions of the November 30, 1979 Order and the January 3,1980 Modifications to the November 30, 1979 Order remain in effect in accordance with their terms.

It is our understanding that Unit 1 will be removed from service November 1980 for a refueling outage, and that during that outage, hydrostatic tests and eddy current examinations of 100 percent of all unplugged steam generator tubes, will be performed. Pursuant to 10 CFR 50.54(f) we request that you provide the NRC, within 15 days of your receipt of this letter, your plans and schedule for these steam generator tube inspections.

Following the staff's review of your proposed plans and schedule, consideration will be given to the ne::essity of issuing an Order confirming your program or modifying your program to establish additional requirements.

If you have any questions on this subject, please contact us.

Sincerely, n

Edson G. Case, Acting Director Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page S009040

o t

Mr. Sol Burstein Wisconsin' Electric Power Conpany Mr. Bruce Churchill, E' squire Mr. Wi1.11am Guldemond

~

cc:

Shaw, Pittman, Potts and Trowbridge USNRC Resident Inspectors Office:.

1800 M Street, N.W.

, 6612 Nuclear Road Washington, D. C.

20036

Two' Rivers, Wisconsin 54241 JosephMannL5brary 1516 Sixteenth Street

~

Two Rivers, Wi::consin.54241 Mr. Glenn A. Reed, Manager

. Nuclear Operations Wisconsin Electric Power Conpany i

Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin ' 54241 i

Walter L. Myer Town Chairman i

Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Ms. Kathleen M. Falk General Counsel Wisconsin's Environmental Decade 302 E. Washington Avenue Madison, Wisconsin 53703 Director, Tech'nical Assessment Division Office of Radiation Programs (AW-459)

U. S. Environmental Protection Ag'ency Crystal Mall f?.

Arlington, Virginia 20460 U. S. Environmental Protection Agency Federal Ac~tivities Branch Region V Office ATTN:

EIS C0ORDINATOR 230 S. Dearborn Street Chicago, Illinois 60604 Chairman Public Service Conrnission of Wisconsin Hill Farms State Office Building Madison, Wisconsin 53702

,.s

.