ML19331D808

From kanterella
Jump to navigation Jump to search
Forwards LER 80-033/03L-0
Date released: 12/11/2019 Download: ML19331D808


LER 80-033/03L-0:on 800803,following Routine Sampling of Core Flood Tank A,Sample Isolation Valve CFV-11 Failed to Close.Caused by Failed Contact Rotor in Limitorque Operator. Contact Rotor 2 Replaced & Declared Operable
ML19331D817
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/28/1980
From: Neuschaefer E
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19331D817 (2)
Forwards LER 80-033/03L-0
ML19331D807
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/29/1980
From: Hancock J
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19331D807 (1)