ML19331D396

From kanterella
Jump to navigation Jump to search
Corrected Tech Specs 3/4.5 Re Min Boron Concentration Values Which Were Included in Amends 44 & 27 to Licenses DPR-53 & DPR-69,respectively
ML19331D396
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/15/1980
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19331D397 List:
References
NUDOCS 8009020338
Download: ML19331D396 (4)


Text

_

lll 3/4.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)

SAFETY INJECTION TANKS LIMITII;G CONDITION FOR OPERATION 3.5.1 Each reactor coolant system safety injection tank shall be OPERABLE with:

a.

The isolation valve open, b.

A cnntained borated water volume of between 1113 and 1179 cubic feet of borated water (equivalent to tank levels of between 187 anc 199 inches, respectively),

c.

A boron concentration of cetween 1720 and 2200 ppm, and d.

A nitrogen cover-pressure of ce: ween 2C; E 250 psig.

APPLICABILITY: MODES 1, 2 and 3.*

ACTION:

a.

With one safety injection tank inoperaDie, except as a rest.t of a closed isolation valve, restore the inoperable tank tc OPERABLE status within one hour or be in HOT SHUTD0'.C. withi-

ne next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b.

With one safety injection tank inoperable due to the isolation valve being closed, either i= e:iately cper the iscia-icn valve or be in HOT STANDEi wi nin one hour and be in HOT SHUT 0WN within t'he next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS a.5.1 Each safety injection tank snali be demonstratec OPERABLE:

a.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:

1.

Verifying the contained borsted water volume and nitrogen cover-pressure in the tanks, and 2.

Verifying that each safety injection tank isolation valve is open.

"With pressuri:er pressure 1 1750 psia.

CALVERT CLIFFS - UNIT 2 2/4 5-1 Amendment i:.21 800s020 33S

4 EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) b.

At least once per 31 days by verifying the boron concentration of the safety injection tank solution.

c.

At least once per 31 days when the RCS pressure is above 2000 psig, by verifying that power to the isolation valve '

operator is removed by maintaining the feeder breaker open under administrative control.

d.

Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to increasing the RCS pressure above 1750 psia by verifying, via local indication at the valve, that the tank isolation valve is open.

e.

At least once per 18 months by verifying that each safety injection tank isolation valve opens automatically under each of the following conditions:

1.

When the RCS pressure exceeds 300 psia, and 2.

Upon receipt of a safety injection test signal.

f.

Within one hour prior to each increase in solution volume of > 1% of normal tank volume by verifying the boron concentration at the operating high pressure safety injection pump discharge is between 1720 and 2200 ppm.

CALVERT CLIFFS - UNIT 2 3/4 5-2 Amendment No. 27

'O 3/4.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)

SAFETY INJECTION TANKS LIMITING CONDITION FOR OPERATION 3.5.1 Each reactor coolant system safety injection tank shall be OPERABLE with:

a.

The isolation valve open, b.

A contained borated water volume of between 1113 and 1179 cubic feet of borated water (equivalent to tank levels of between 187 and 199 inchen, respectively),

c.

A baron concentration of between 1720 and 2200 pcm, and d.

A nitrogen cover-pressure of between 20; ar.d 250 psig.

APPLICABILITY:

MODES 1, 2 and 3.*

ACTION:

a.

With one safety injection tank inocerable, except as a resuit of a closed isolation valve, restore the incperable tank to OPERABLE status within one hour or.be in HOT SHUTDOWN within tne next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

~

With one safety injection tank inoperable due to the isclation b.

valve being closec, either inmeciately open the isciation valve or be in H3T STANDSY witnin one nour ar.d be in HOT SHUTDOWN within the next 12 nours.

SURVEILLANCE RECUIREMENTS a.E.1 Each safety injection tank shall be demonstrated GPERASLE:

i a.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:

1.

Verifying the contained borated water volum.e and nitrogen cover-pressure in the tanks, and-2.

Verifying that each safety injection tank isolation valve is open.

  • Witn pressurizer pressure > 1750 osia.

CALVERT CLIFFS - UNIT 1 3/4 5-1 Amencment No. 38

a EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIRENENTS (Continued) b.

At least once per 31 days by verifying the baron concentra. tion of the safety injection tank solution, c.

At least once per 31 days when e RCS pressure is above 2000 psig, by verifying that pov,er to tne isolation valve operator is removed by maintaining the feeder breaker open under administrative control.

d.

Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to increasing the RCS pressure above 1750 psia by verifying, via local indication at the valve, that the tank isolation valve is open, e.

At least once per 18 months by verifying that each safety injection tank isolation valve opens automatically under each of the following conditions:

1.

When the RCS pressure exceeds 300 psia, and 2.

Uoon receiot of a safety injection test signal, f.

Witnin one hour prior to each increase in solution volume of 2 it of normal tank volume by verifying the bcron concent-racion at the operating hign pressure safety injection puno cischarce is between 1720 ann 2200 ppm.

l 1

3/; 5-2 Arendeent No, a:

CALVERT CL:FFS - UN:7 i