ML19331D190
| ML19331D190 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 06/09/1980 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19331D180 | List: |
| References | |
| NUDOCS 8008270448 | |
| Download: ML19331D190 (2) | |
See also: IR 05000508/1980004
Text
p atom
o
UNITED STATES
[}3,,\\ '^y [
NUCLEAR REGULATORY COMMISSION
'
.
.
e
REGION V
o-
' a'8
1990 N. CALIFORNIA BCULEVARD
'%#
SUITE 202, WALNUT CREEK PLAZA
o
e,,,*
WALNUT CREEK, CALIFORNIA 94596
JUN
9 1980
Docket Nos. 50-508
50-509
Washington Public Power Supply System
P. O. Box 468
Richland, Washington 99352
Attention: Mr. N. 0. Strand
Managing Director
Gentlemen:
Subject:
NRC Inspection - WNP 3 and 5
This refers to the inspection conducted by Messrs. D. F. Kirsch and
W. J. Wagner of this office on May 20-23, 1980 of activities authorized
by NRC Construction Permit Nos. CPPR-154 and CPPR-155, and to the discussion
of our findings held by Mr. Kirsch with Mr. W. J. Talbott and other
members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix A.
These items of noncompliance have been categorized into a level as
described in our correspondence to all NRC licensees dated December 31, 1974.
This notice is sent to you pursuant to the provisions of Seci; ion 2.201,
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office,
within thirty (30) days of your receipt of this notice, a written statement
or explanation in reply including (1) corrective steps which have been
taken by you and the results achieved; (2) corrective steps which will
be taken to avoid further violations; and (3) the date when full compliance
will be achieved.
l
8008270LN
l
.
4
~
Washington Public Power Supply System -2-
JUN
9 590
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the encl'aec inspection report will be placed in the NRC's Public Document
Prom.
If this report contains any information that you believe to be
' caprietary, it is necessary that you submit a written application to
,this office, within 30 days of the date of this letter, requesting that
m information be withheld from public disclosure. The application
c-
t include a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
e1)
pj4pscW
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
A.
B.
IE Inspection Report
Nos. 50-508/80-04
50-509/80-04
cc w/o enclosure B:
M. E. Witherspoon Division Manager
Quality Assurance, WPPSS
cc w/ enclosures:
W. J. Talbott, Division Manager, WPPSS