Forwards IE Insp Rept 50-458/80-05 on 800527-30 & 0602-05 & Notices of Violation & Deviation
ML19331C502
Person / Time
Site: River Bend 
Issue date: 07/10/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Draper E
GULF STATES UTILITIES CO.
Shared Package
ML19331C503 List:
References
NUDOCS 8008180584
Download: ML19331C502 (2)


See also: IR 05000458/1980005

Text

fSG

[e8 u%[%

UNITED STATES

NUCLEAR REGULATORY COMMISSION

.l* ' s N

REGloN IV

o

T

li

!

c

611 RYAN PLAZA DRIVE.SulTE 1000

,j

ARLINGTON, TEXAS 76012

7 gl[Q[g

.

(3' . . . . . 'o

,

July 10, 1980

In Reply Refer To:

RIV

Docket No. 50-458/Rpt. 80-05

,

Gulf States Utilities

ATTN:

Dr. E. Linn Draper, Jr.

Vice President-Technology

Post Office Box 2951

Beaumont, Texas

77704

Gentlemen:

This refers to the inspection conducted by Mr. A. B. Beach of our staff during

the periods May 27-30 and June 2-5, 1980, of activities authorized by NRC

Construction Permit No. CPPR-145 for River Bend, Unit No.1, and to the dis-

cussion of our findings with Mr. T. L. Crouse and other members of your staff

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective eramination of procedures and representative records, interviews

with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with Appendix 3 to 10 CFR 50 of the NRC Regula-

tions, " Quality Assurance Criteria for Nuclear Power Plants." The items of non-

compliance and references to the pertinent requirements are identified in the

enclosed Notice of Violation.

'

This notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10- .3de of Federal Regulations.

Section 2.201 requires you to submit to thi. office, within 30 days of your

receipt of this notice, a written statement or explanation in reply including:

(1)

corrective steps which will be taken by you, and the results achieved;

j

(2)

corrective steps which will be taken to avoid further noncompliance; and

(3)

the date when full compliance will be achieved.

'

The item of noncompliance involving the placement of safety-related concrete

prior to assuring that the aggregate used in the concrete meets the specifica-

tion requirements has been the subject of previous items of noncompliance. We

are concerned about the ef6.ctiveness of your management control program that

will allow this noncompliance to be repeated. Consequently, in your reply to

the Notice of Violation, please provide separate comments concerning plans you

may have to improve the effectiveness of your management control program in

this regard.

8008180584

.

_..

-

.

.

.

.

.

.

. . .

.

Gulf States Utilities

2

July 10, 1980

During this inspection, it was also found that certain of your activities

appeared to deviate from commitments in the PSAR.

This item and references to

the specific commitments are identified in the enclosed Notice of Deviation. In

your reply, please include your comments concerning this item, a description of

any steps that have been or will be taken to correct it, a description of any

steps that have been or will be taken to prevent recurrence, and the date all

corrective actions or preventive maasures were or will be completed.

Three new unresolved items are identified in paragraphs 2.d. (2)(b), 3.a and 3.b

of the enclosed report.

Information with regard to investigative effort on an

allegation is contained in paragraph 2.c.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure.

The application cast include a full statement of the reasons

why it is claimed that the information is proprietary.

The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear fren you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,


h

'J.

C. Seidle, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Appendix B, "otice of Deviation