O VIRGINIA ELECTRIC AND POUER COMPANY NORTH Af;flA POWER STATION MONTHLY OPERATING REPORT .

MONTH _ g YEAR m y

APPROVED:

L STATION MANAGEY f

800818n q 3a

OPERATING DATA REPORT 50-338 DOCKET NO. ,

DATE F: 5 Rn COMPLETED BY h . A. Woodsmall III TELEPHONE U U.5 ) 694-5151 -

OPERATING STATUS North Anna 1 Notes -

1. Unit Name:

July 1980

2. Reporting Period:
3. LicensedThermalPower(MWt): 2775 4'-
4. Nameplate Rating (Gross MWe): 947 . . - .
5. Design Electrical Rating (Net MWe): 907 A. Maximusr Dependable Capacity (Gross MWe): 880 ~ ,, .
7. Maximum Dependable Capacity (Net MWe):

850

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A-

9. Power Level To Which Restricted,1f Any (Net MWe): N/A
10. Reasons For Restrictions,if Any: N/A

) .

This Month Yr..to-Date Cumulative i

!!. Hours In Reporting Period 744 5.111 1R_RRA

12. Number Of Hours Rese:or Was Critical 7a1.? 4.235 R 14 401 n
13. Reactor Reserve Shutdown Hours 2.8 55.6 203.9
14. Hours Generator on-Line 734.8 4,036.7 14.089.9 u 0 0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1,956,792 10.120.625 36.400.538
17. Gross Electrical Energy Generated (MWH) 609,631 _. 3.157.969 11.504.318
13. Net Electrical Energy Generated (MWH) .

573,565 2,965,061- 10.819.507

19. Unit Service Factor 98.7 79.0 74.6
20. Unit Availability Factor 98.7 79.0 74.6
21. Unit Capacity Factor (Using MDC Net) 90.7 68.3 67.4
22. Unit Capacity Factor (Using DER Net) 85.0 64.0 63.2
23. Unit Forced Outage Rate I.2 11.8 7.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): .'

Refuelina: sh weekc:i G or o m h p r 1 4 R O a nri .lannary 1091

25. If Shur Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 19/77)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-338 NA 1 l UNIT l

DATE 8-5-80 l COMPLETED BY W. A. Woodsmall, III TELEPHONE (703) 894-5151 MONTH July 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 810 803 >

37 2 809 :g 802 .

3 810 19 535 4 808 147 20 5 808 21 647 6 M 22 801 7 808 23 804 7

8 810 24 807 9 811 25 806 to 807 26 808 11 799 27 808- _

12 805 23 803 13 808 29 807 14 806 30 798 15 803 3 809 16 803' INSTRUCTIONS On this format, tist the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

l -

I .

D' 50-338 UNITSilUIDOWNS AND POWER REDUCTIONS DOCKETNO. lA 1 I, UNIT NAME

DATE U-5-80 July COMPLETED HY W. A. Woodsma' 1, III l REPO. RT MON 1Il TEl,EPil0NE (703) 894-515' w.

- E c

- 5g 'h j Ni 1.icensee S t, . Cause & Corrective No. Dite { Eg s js& Event 3 'g y"3 Action to H jZ E y gj e e a Repori11 mU o u

Prevent Recurrence c5 80-20 800719 F 9.2 A* 3 N/A N/A N/A Turbine trip / reactor trip due to "A" S/G lo level FF/SF mismatch.

Water was in instrument air lines ,

which resulted in loss of feed flow control. Air lines were blown down and the reactor was restarted.

I 2 3 i 4 F: Forced Reason: Method: Exhibit G. Instructions 5: Scheduled A Equipment Failure (Explain) l Manual ror Preparation of Data B-Maintenance of Test 2-Manual Scram. Entey Sheets for Licensee C Refueling 3 Automatic Scre:n. Event Repost (LER) File (NURI G-D-Regulatory Resteletion 4 Other (Explain) 0161)

E Operator Training & License Examination ,

F Administrative 5 G Operational Error (Explain) Exhibit I Same Source (9/77) Il Othet (Explain)

  • See attached sheet

~

Paga 1 cf 1 UNIT SHUIDOWN AND POWER REDUCTIONS EXPIANATION SHEET DOCKET NO. 50-338 REPORT MONTH July UNIT NAME North Anna YEAR 1980 DATE August 5, 1980 COMPLETED BY W. A. Woodsmall, III 49 80-20 (A) 7/19/80 Ti=e: 1600 began ra: ping load down at 4%/ min. because of water in instrument air lines. The loss of air led to losing I feedwater control which resulted in a feed flow / steam flow misnatch'and "A" S/G lov level; causing a turbine trip / reactor trip. All feed water control air lines for Unit 1 were blown down.

OPERATING DATA REPORT DOCKET NO. 50-339 DATE 8-5-80 COMPT.ETED BY W. A. Woodsma11,iI[

TELEPHONE t/u.sA tsn -5151 -

OPERATING STATUS

~ '

North Anna 2 Not*5 .

1. Unit Name:
2. Reporting Paiod. Julv 1980
3. I icen*=d Thermal Power (MWt): 110 ' '

947 - '- = ' '

4. Nameplate Rating (Gross MWe):
5. Design Electncal Rating (Ne't MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 928 T. Maximum Dependable Capacity (Net MWe): 898
8. If Changes Occur in Capacity Ratings (Items Number 3 Thmugh 7) Since Last Report. Give Reasoas:

N/A

9. Power Leve' To Which Restricted,If Any (Net MWe): N/A
10. Reasons For Restrictions.If Any: N/A f- .

This Month Yr to.Date Cumulative

11. Hours in Reporting Period 745 1464 laFa
12. Number Of Hours Rese:or Was Critical 251.6 510.6 c;10 6
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Geners;or On.Line 0 0 0
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Eeergy Generated (MWH) 4.362 4.362 4.362
17. Gross Elec:rical Energy Generated (MWH) 0 _ , _

0 0

18. Net Electrical Energy Generated (MWH) 0 0 0
19. Unit Service Factor N/A N/A N/A l
20. Unit Availability Factor N/A N/A nla l l 21. Unit Capacity Fsetor (Using MDC Net) N/A N/A M /a
22. Unit Capacity Factor (Using DER Net) N/A N/A N'/A j
23. Unit Forced Outage Rate N/A N/A N/A l
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Er:h): -

N/A

25. If Shur Down At End Of Report Period. Estimated Date of Startup: N/4
26. Units in Test Status Prior to Commercial Operationi: Forecast Achieved 6/1?/80 INITIAL CRITICALITY INITIAL ELECTR!CT. Y 8/21/R0 COMMERCIAL OPERATION 9/21/80

("/77 )

i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-339 UNIT NA 2 j DATE 8-5-80 COMPLETED BY W. A. Woodsmall, III '

TELEPHONE (703) 894-5151 MONTH July 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MW Net) (g )

17 -s*'

2 0 ,, n 3 0 g, ,

4 0 0 20 5 0 0 21 6 0 22 0 7 0 ,a 0

(_

8 0 o 24 9 0 25 0 10 0 26 0

11 0 0 27 .

12 0 28 0 13 0 0 29 14 0 0 30 15 0 3, -0 16 0 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

T DOCKET NO. 50-339 UNIT SilU1 DOWNS AND POWER REDUCTIONS UNIT NAME NA 2 DATE 8-5-80 COMPLETED fly W. A. WOOdSmall, III REPORT MONTil July 1980 TELEPflONE (/03) 894-5151 f .

c

, 3E 3 y Y ".; l.icemcc Eg,  % Cause & Corrective No. Dite g is ij s jss F, vent u 'f o3 Action to c H 3 ;g c 2

Reporier <E U u

!O Present Recurrence c5 Ini :ial elactri :al generatic n not achieved.

o t

3 I 4 l

I 2 F: Forced Reason: Method: Exhibit G. instructhms S: Scheduled A Equipment Failure (Explatn) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry Sheets for 1.leensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-

. D Regulatory Resirletion 4 Other (Explain) 0161)

E Operator Training A Ucense Examination ,

F Administrative 5 G-Operational Error (Explain) Exhibit i . Same Source 07/77) Il-Other (Explain) .

6%