ML19331C269

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-491/80-08,50-492/80-07 & 50-493/80 -07 on 800624-25.No Noncompliance Noted
ML19331C269
Person / Time
Site: Cherokee  
Issue date: 06/16/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19331C263 List:
References
NUDOCS 8008140482
Download: ML19331C269 (2)


See also: IR 05000491/1980008

Text

-

,

,

.

[

4

UNITED STATES

'

!

3

NUCLEAR REGULATORY COMMISSION

'

5

.E

REGION ll

I

'8

o,

101 MARIETTA ST., N.W., SUITE 3100

ATLAh TA, GEORGIA 30303

  • ses*

In Reply Refer To:

RII:NE

50-491/80-08

50-492/80-07

.

50-493/80-07

Duke Power Company

ATTN:

L. C. Dail, Vice President

Design Engir.eering

i

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by N. Economos of this office on June 24

through 25, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-

167, CPPR-168, and CPPR-169 for the Cherokee facility, and to the discussion of

our findings held with you at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such, application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard withir the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

C. E. Murph , thief

Reactor Construction and Engineering

Support Branch

Enclosure:

See Page 2

8008140

'

.

.

..

-

.

r

.

.

. .

.

/

JUL 161980-

'

Duke Power Company

-2-

,

1

-1

Enclosure:

Inspection Report Nos. 50-491/80-08,

50-492/80-07,and'50-493/80-07

.

cc w/ enc 1:

J. T. Moore, Project Manager

,

,

,

!

f

?

!

e

I

).

.

l

t

E

4-?

L

F

-

n

t

i

i

i

.

1

I-

,

.

1

i

i

!

,

4

d

I

4

.

_ _ , ~ _ _ - _ _ , , _ _ .

. - . _ , _ _ . _ , . . - . . _ _ . . _ -__

- . . , , _ . . . - , . _ . . - - .