Forwards IE Insp Repts 50-440/80-09 & 50-441/80-09 on 800610-12 & Notice of Violation
ML19331C127
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 06/26/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML19331C128 List:
References
NUDOCS 8008140195
Download: ML19331C127 (2)


See also: IR 05000440/1980009

Text

1

r "%,'o

TtC

.

e

d

UNITED STATES

8",#

1

NUCLEAR REGULATORY COMMISSION

,

E

REGION lil

$

~

  1. ^

799 ROOSEVELT ROAD

'g

GLEN ELLYN, ILLINOIS 60137

o

  • ..*

IJUN 2 6 car)

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN:

Mr. D. R. Davidson

Vice President - Engineering

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the inspection conducted by J. E. Konklin of this office

on June 10-12, 1980, of activitiss at the Perry Nuclear Plant Project,

Units 1 and 2, authorized by NRC Construction Permits No. CPPR-148 and

No. CPPR-149 and to the discussion of our findings with W. J. Kacer and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office within thirty

days of your receipt of this notice a written statement or explanation in

reply, including for each item of noncompliance:

(1) corrective action

taken and the results achieved; (2) corrective action to be taken to avoid

further noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you

or your contractors believe to be prcprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

800814o195

'

.

6

Cleveland Electric Illuminating

-2-

JUN 2 6 S30

Company

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary in-

formation identified in the application is contained in an enclosure

to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

e

nuK

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-440/80-09 and

No. 50-441/80-09

cc w/ encl:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power Siting

Commission

Mr. Daniel D. Wilt, Attorney

Helen W. Evans, State of Ohio

!

l

l

--

-

-

.

.. .

.

_-

_ _ _

.