ML19331B848

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1980
ML19331B848
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/01/1980
From: Culver M
FLORIDA POWER CORP.
To:
Shared Package
ML19331B847 List:
References
NUDOCS 8008130413
Download: ML19331B848 (3)


Text

,,

N,,/ '

OPERATING DATA REPORT DOCKETNO. 50-302 DATE 8/1/80 COMPLETED BY M. W. Culver TELEPHONE (9ma170E-6486 OPERATING STATUS I. Unit Name:

crystal River Unit #3 Notes

2. Reporting Period: 7/1/80 - 7/31/80 2452
3. Licensed Thermal Power (MW ):

890

4. Smeplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

825

6. Maximum Dependable Capacity (Gross MWe): 821 782
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To hhich Restricted. If Any (Net MWe):

none

10. Reasons For Restrictions. If Asy:

) Q)

This Month Yr..to.Da t e Cumulative I1. Hours In Reporting Period 744 5111 29687

12. Number Of Hours Reactor Was Critical 0

1305.5 16455.8

13. Reactor Reserve Shutdown Hours 0

0 1116.9

14. Hours Generator On.Line 0

1297.4 15997.6

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 3085927 35402838
17. Gross Electrical Energy Generated (MWH) 0.;

1058396 12030164 ___

18. Net Electrical Energy Generated (MWH) 0 1009335 11400975
19. Unit Service Factor 0

25.4%

53.9%

20. Unit Availability Factor 0

25.4s 53.9%

21. Unit Capacity Factor (Using MDC Net) -

0 25.3%

49.1%

22. Unit Capacity Factor (Using DER Net) 0 23.9%

46.6%

23. Unit Forced Outage Rate 0

18.0%

34.4%

24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

continuing refueling outage

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

8/6/80

26. Units In Test Status IPrior to Commercial Operat;on):

Forecast Achiesed INITIAL CRITICALITY 1/1 a /77 INITIA L ELECTRICITY 1/30/77 5

COMMERCIAL OPER ATION 3/13/77 o

l l

8008130yl$

^

DOCKET NO.

50-302 UNIT SilUTDOWNS AND POWER REDUCTIONS UNI T N AME

.FLCRP-3 DATE n /1/nn COMPLETED BY u u cui u-REPORT MONTil July ELEPilONE

,an p 795-6486 E

E

,$"E 3

jY3 Licensee

,E*

je, Cause & Corrective No.

D.sie g

3g 5

.g g 5 Event

?

n8 Action to

$E 5

jgg Repost #

&G

[v Present Recurrence d

80-9 800701 S

744 C

4 N/A ZZ ZZZZZZ Continuation of the refoeling outage begun on 3/7/80.

I 2

3 4

F: Forced -

Reason:

Method:

Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain)

I Manual for Pseparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NilRI.G-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examinati+m F-Administ rative 5

G-Osrational E:ror (Explain)

Exhibii 1 - Same Source l')/17) ll-04her (Explain)

  • w

.m

AVERAGE DAILY UNIT POWER LEVEL V

DOCKET NO. 50-102 UNIT FLCRP-3 DATE COMPLETED BY M. W. Culver TELEPHONE ronn 7am cann MONT11 July DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) inwe. Net j I

O g7 o

0 0

2 18 3

0 39 0

4 0

0 20 5

21

~

0 0

6 22

\\, /

C' 7

23 0

0 8

24 0

0 9

25 0

10 26 O

0

'. I 27 0

12 28 0

13 29 0

14 30 15 0

O y,

16 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole megswatt.

V (9/77)

-