Forwards IE Insp Repts 50-352/80-02 & 50-353/80-02 on 800122-0222 & Notice of Violation
ML19331B707
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/04/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19331B704 List:
References
NUDOCS 8008120634
Download: ML19331B707 (2)


See also: IR 05000352/1980002

Text

7

.

  1. 8 E84t

UNITED STATES

g

%

NUCLEAR REGULATORY COMMISSION

.*

h

S

REGION l

Os 3

'!

.2, cAax AveNuc

%

.f

KING OF PRU551 A. PENNSYLV ANI A 19406

JUN 04 280

Docket Nos. 50-352

50-353

Philadelphia Electric Company

ATTN:

Mr. John S. Kemper

Vice President

Engineering and Research

2301 Market Street

Philadelphia, Pennsylvania

19101

Gentlemen:

Subject: Combined Inspection 50-352/80-02; 50-353/80-02

This refers to the inspection conducted by Mr. J. Mattia of this office on

January 22-31, 1980 and February 1-22, 1980 at the Limerick Generating Station,

Units 1 and 2, Limerick, Pennsylvania of activities authorized by NRC License

Nos. CPPR-106 and CPPR-107 and to the discussions of our findings held by Mr.

Mattia with Mr. Corcoran and others of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these ' areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that certain of your activi-

ties were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

These items of

noncompliance have been categorized into the levels as described in our corres-

l

pondence to you dated December 31, 1974.

This notice is sent to you pursuant to

the provisions of Section 2.201"of the NRC's " Rules of Practice," Part 2, Title

l

10, Code of Federal Regulations.

Section 2.201 requires you to submit to this

i

office, within thirty (30) days of your receipt of this notice, a written

'

statement or explanation in reply including:

(1) corrective steps which have

been taken by you and the results achieved; (2) corrective steps which will be

taken to avoid further items of noncompliance; and (3) the date when full com-

.

pliance will be achieved.

l

Item number A shown in the Notice of Violation enclosed with this letter, is a

recurrent item.

In your response please give this matter your particular at-

l

tention.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary

80081e0

.

.

.

-

.

,

Philadelphia Electric Company

2

that you make a written application within 30 days to this office to withhold

such information from public disclosure. Any such application must be accom-

panied by an affidavit executed by the owner of the information, which identi-

fies the document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be considered

by the Commission as listed in subparagraph (b) (4) of Section ?. 790.

The

information sought to be withheld shall be incorporated as far as possible irto

a separate part of the affidavit.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

w

,

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

'

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Combined

Inspection Report Numbers 50-352/80-02; 50-353/80-02