Forwards IE Insp Rept 50-213/80-04 on 800318-21.No Noncompliance Noted
ML19330C231
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/26/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19330C232 List:
References
NUDOCS 8008080108
Download: ML19330C231 (2)


See also: IR 05000213/1980004

Text

.

.

7s

UNITED STATES

[p mag

o

NUCLEAR REGULATORY COMMis5 ION

[

o

REGION 1

M

g

431 PARK AVENUE

V

2

KING OF PRUS$1 A. PENNSYLVANIA 19406

\\ ..... /

Docket No. 50-213

.JUN 2 6 1980

Connecticut Yankee Atomic Power Company

ATTN:

Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection No. 50-213/80-04

This refers to the inspection conducted by Mr. T. H. Smith of this office on

March 18-21, 1980, at Haddam Neck Plant, Haddam, Connecticut of activities

authorized by NRC DPR-61 and to the discussions of our findings held by Mr. T. H.

Smith with Mr. R. Graves at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC s Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must be accompanied by an affidavit executed by the owner of the

information, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph (b) (4) of

Section 2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be placed in

the Public Document Rocc.

8008080108

m

.

.

.

Connecticut Yankee Atomic Power Company 2

JUN 2 61980

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

[ ,

__

-

_

El o

. Brunner, Chief

Reac or 0)erations and Nuclear

Support

3 ranch

Enclosure:

' Office of Inspection and Enforcement

Inspection Report No. 50-213/80-04

cc w/ enc 1:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

--

.-

,.

__ -