July 31,1980 9'
For:
The Comissioners From:
T. A. Rehm, Assistant for Operations, Office of the EDO
Subject:
WEEKLY INFORMATION REPORT - WEEK ENDING JULY 25, 1980 A summary of key events is included as a convenience to those Commissioners who may prefer a condensed version of this report.
Contents Enclosure Administration A
Nuclear Reactor Regulation B
Standards Development C
Nuclear Material Safety and Safeguards D
Inspection and Enforcement E
Nuclear Regulatory Research F*
Executive Legal Director G*
International Programs H
State Programs I
, Management and Program Analysis J
Controller K
Analysis and. Evaluation of Operational Data L*
Items Approved by the Commission M **
Calendar of Speaking Engagements N
/
//I N
./
T. A. Rehm, Assistant for Operations Office of the Executive Director
- No input this week.
- Daleted from Commissioners and PDR copies.
8 0 8 070 Qcao A
hm, 27781
.t 8,
Summary of Weekly Infomation Report Week Ending July 25, 1980 Peach Bottom Unit No. 3 On July 19, 1980, we issued an amendment to the Unit No. 3 Tecnnical Specifi-cations. The amendment revised, temporarily, the specification on inoperable snubbers as it applies to a specific, single snubber located on the RHR system.
The change, which permitted inoperability of this snubber for 10 days in lieu of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, was authorized based on a reanalysis that the RHR system would remain operable in the event of a Design Basis Earthquake even with a failed snubber.
_ Radiation Pol _ icy Council Public Meetino in Boston The U.S. Radiation Policy Council held a public meeting in Boston on Tuesday, July 22, 1980.
This was the first of four meetings to be held at various locations throughout the country.
The topics discussed were occupational radiation regulations, radon in inhabited structures and low-level radioactive waste from medical and research institutions. The meeting was attended by 40 to 50 individuals, of which 11 made presdntations. All the speakers could be classified as being in favor of activities involving radiation except possibly those addressing the radon-in-buildings problem. The most often repeated com-ments were that the Federal Government should take the lead in educating the public about radiatico and should take steps that would permit incineration or local burial of LLW.
NFS - West Valley NMSS and ELD staff met with representatives of-NFS and New York State ERDA on July 17, 1980, regarding planned site investigations of the high-level waste storage systems by Rockwell-Hanford under NRC contract.
NFS had earlier taken a position that prior to granting permission for Rockwell to conduct activities at West Valley, appropriate indemnification agreements must be developed. The involved parties have agreed to attempt to negotiate an acceptable solution to the indemnification issue.
Property Contamination in West Chicaao, Illinois An-area of contamination, of about 25 square feet, has been found on private property in West Chicago, Illinois.
Elevated levels of alpha activity have been detected at ground level which are well above NRC limits for release of facilities and equipment for unrestricted use.
It is probable that the contamination, like other spots of contamination in West Chicago, is a result of removal of tailings material from the adjacent thorium processing plant before the plant was licensed under the Atomic Energy Act. The plant, now owned by Kerr-McGee, has been closed since 1973.
Region III believes the contamination does not present an immediate safety hazard.
OFFICE OF ADMINISTRATION Week Ending July 25, 1980 ADMINISTRATION OF THE FREEDOM OF INFORMATION ACT f
STATUS OF REQUESTS Initial Appeal of Request Initial Decision Received 451 35 Granted 337 9
Denied 79 15 Pending 45 11 ACTIONS THIS WEEK Received Douglas 0. Lee, Requests all materials authored or co-authored by
' Americans for Nuclear Albert Carnesale regarding the production of energy Energy, Inc.
from nuclear fission, fission or breeder technology, (80-374) materials written by or supervised by Mr. Carnesale during the proceedings of GESM0, statements obtained by the NRC or the White House regarding Mr. Carnesale's qualifications from members of the public, Congress, scientific community, etc., and the official statements of Mr. Carnesale to the International Fuel Cycle Evaluation Conference, and any official transcript which may have been available from that conference.
(NRC employee)
Requests all documents from February 15, 1980 pertaining (80-375) to a grievance filed regarding Vacancy Announcement 79-551.
R. J. Zellner, Requests a copy of a letter identifying an individual McGean Chemical who informed the NRC's Region III of possible radioactive Company, Inc.
material deposited in a disposal dump in Newburg (80-376)
Heights, Ohio.
Scott A. Powell, Requests, on behalf of his client, information regarding Attorney-At-Law his client's exposure to radiation and his purchase of
-(80-377) two trailers.
James Wheaton Requests information regarding the import of uranium (80-378) to the U. S. from Australia.
CONTACT:
J. M. Felton 492-7211 ENCLOSURE A 1
2 Received, Cont'd Isham, Lincoln Requests, on behalf of Commonwealth Edison Company, and Beale a memorandum dated October 18, 1979 by Leonard (80-379)
Bickwit, Jr. entitled " Adequate Protection of the Health and Safety of the Public."
A. Kranish, Requests all documents relating to seismic activity at Trends Publishing, Inc.
the site of the Summer nuclear power facility for the (80-380) period 1978 to the present.
Marc E. Miller, Requests all documents between the Federal government Attorney-At-Law and the General Electric Company with respect to the (80-381) possible purchase, lease, condemnation or other acquisition of all or any part of the GE facility at Morris, Illinois.
(An individual requestin-Requests information on his exposure to radiation.
information about himselc (80-382)
Fred Eissler, Referred from the Department of Justice, (DOS), documents Scenic Shoreline relating to the reasons for closure of the DOS Preservation Conference, Inc. investigation without a grand jury investigation or (80-383) prosecution in the Hosgri geological fault near the Diablo Canyon nuclear power plant and the evidence on which the non-prosecution decision was made.
Randall L. Plant Requests all correspondence between the NRC and (80-384)
Representative Daniel Crane of Illinois.
Jack E. Pevenstein, Requests a copy of the non-proprietary versions of the NUSAC, Inc.
technical proposals in response to contract solicitation (80-385)
RFP No. RS-01E-80-253 entitled " Development of Automated Vendor Selection System."
William J. Jordan III, Requests, on behalf of Concerned Citizens of Rhode Harmon & Weiss Island, all documents relating to the burial of (80-386) radioactive wastes at the UNC facility in Wood River Junction, Rhode Island, all documents relating to the possibility that Strontium 93 is present at the UNC facility, all documents related to the receipt by the UNC of fuel for or from a "zero power reactor", and all documents related to the disposition of the nuclear material that was involved in the chain reaction accident in 1964.
(NRC employee)
APPEAL TO THE COMMISSION for a copy of the Office of (80-A-27-80-310) the Inspector and Auditor's report on the findings of their investigation concerning the Cashier's Office.
ENCLOSURE A n _
3 Granted Stevan D. Phillips, In response to a request for information on shipments Attorney-At-Law of radwaste materials from nuclear electric generating (80-236) facilities to low-level waste disposal sites, made available this information.
Lloyd Etheredge, In response to a request for information regarding University of California availability of NRC meeting records concerning Three (80-332)
Mile Island, informed the requester these records are available at the PDR.
(An individual requesting Made available information on his Reactor Operator information about himself) license exam results.
(80-346) 1 William Hegarty, In response to a request for inspection documents Self-Powered Lighting since December 31, 1979 regarding the U. S. Radium Limited Corporation, informed the requester there are no (80-350) documents pertaining to his request.
Mendel A. Puschel, In response to a request for a copy of contract
' Consumers Power Company Proposal No. RS-NRR-80-lll entitled " Characterization (80-352) of Nuclear Power Plant Protective Coating Systems Under Design Basic Accident Conditions" made available this document.
Ellyn R. Weiss, In response to a request for a copy of a speech Sheldon, Harmon delivered by Robert Burnett to the annual meeting of the
& Weiss Institute of Nuclear Materials Management, made (80-353) available a copy of three speeches presented at that meeting.
(Individuals requesting Made available copies of their Operator License exam information about themselves) results to Mr. R. C. Arnold, Sr. Vice President, (80-362 thru 80-367)
Metropolitan Edison Company.
R. J. Zellner, In response to a request for a copy of a letter McGean Chemical Company, identifying the individual who informed NRC's Inc.
Region III of possible radioactive material deposited (80-376) in a disposal dump in Newburgh Heights, Ohio, informed the requester the NRC did not receive a letter but a telephone call.
ENCLOSURE A l
4 Granted, Cont'd Donald F. Knuth,-
In response to an appeal for a list of equipment KMC, Inc.
that has been environmentally qualified, provided (80-A-20-80-136) two documents' containing equipment that has been '
environmentally tested.
Katherine A. Meyer, In response to a request for documents pertaining Attorney-At-Law to the transportation of spent nuclear fule from (80-298)
Portsmouth, Virginia to the Savannah River Plant in Aiken, South Carolina, made available eight documents.
Denied portions of five documents considered commercial or financial (proprietary) information.
Informed the requester other documents subject to her request are already available at the PDR.
Martin A. Welt, In response to an appeal for a copy of a document Radiation Technology, Inc.
regarding the Commission'; decision not to review (80-A-18-80-48) the Radiation Technology, Inc. 's appeal for a by-
~
product material license, the Commission denied this document which contains analyses, opinions, conclusions, and recommendations, the release of which would adversely affect the ability of the Commission and its legal staff to freely discuss and deliberate the merits of a proceeding prior to its decision.
ENCLOSURE A
4 DIVISION OF CONTRACTS ~
Week'Ending July. 25, 1980 RFF'S ISSUED RFP RS-ADM-80-689 Title'- Acquisition and Installation of a Data General 4244 (or Equal) 900 LPM Line Printer Subsystem Description - The contractor shall provide the subsystem described above
'and install on existing NRC-owned Data General ECLIPSE computer.
Period of Performance - One yecr with option for additional year Sponsor - Office of Administration Status - RFP issued July 15, 1980.
Proposals are due August 12, 1980.
PROPOSALS UNDER EVALUATION 1.
RFP RS-ADM-80-687 Title - Professional Secretary Development Program Description - Program designed to (1) assist secretarial personnel in becoming better informed of the areas of knowledge associated with the work of a professional secretary, (2) assist them in clearly identifying areas of knowledge that may be required, and (3) assist them in developing and implementing individual career development needs.
Period of Performance - Two years Sponsor - Office of Administration
-Status - Revised Proposal received July 18, 1980, under evaluation.
2.
RFP RS-NMS-80-067 Title - Evaluation of Trench Subsidence and Stabilization at Sheffield Low-Level Waste Disposal Facility Description - Provide detailed information on trench subsidence and stabilization at the Sheffield Low-Level Waste Disposal Facility in Illinois to aid the NRC in evaluating the long-term performance of the Sheffield facility.
Note:
This procurement is 100% set-aside for small business participation.
Period of Performance - Five months Sponsor - Office of Nuclear Material Safety and Safeguards Status - The. proposals received are under evaluation.
ENCLOSURE A
2 CONTRACT AWARDS NRC-03-80-106 Title - Review of Non-Radiological Environmental Operating Data Description - The contractor shall perform technical reviews of extensive environmental monitoring data at three operating plants to assist in making licensing amendments. The specific objective of ~each aspect of the monitoring program, as well as the. details of sampling schedules and methodology, are described in the Environmental Technical Specifications for each plant.
Period of Performance - One year Sponsor - Office of Nuclear Reactor Regulation
-Stat'as - A-cost-plus-fixed-fee contract in the total amount of $61,905.00 was awarded on July 21, 1980 to Environmental Science and Engineering, Inc., Gainsville, Florida.
CONTRACTS CLOSED OUT (All administrative action completed and final payment made)
Contract No.
Contractor Close-Out Date NRC-04-74-313 University of New Mexico 7/21/80 4
ENCLOSURE A
e o-
-.y.-
~'
d 4
DIVISION OF.SECURIT)
ITEMS.0F' INTEREST-
-s WEEK ENDING JULY 25, 198(.
Messrs.: Harris and Burch, Facilities and Systems Security On July 23, 1980, h
h Branch (FSSB), met with representati es of the Ceneral Ser ices Administration, Federal Protectihe-Service Division, regarding the systems (e.g., alarms and card key access) security. requirements for NRC Headquarters buildings-for
=~ -
FY 81-and FY 82.
b I
l
=
I
^
4 4'
e z.
s O
ENCLOSURE ~A
,- r 3
y 4,
7e-.
.-ww i-,
>m-s av-.
w
~
LOFFICE OF NUCLEAR REACTOR REGULATION MEEKLY ITEMS OF INTEREST (WEEK ENDIl1G July 25,1980)
BREAZEALE fiUCLEAR REACTOR (TRIGA)
On about July 16,'1980, while making routine changes in fuel loading o-f the Breazeale Nuclear Reactor (TRIGA) at Penn State University, total available reactivity exceeding Technical Specification limit was inadvertently loaded.
This excess did not violate their licensed shut-down margin.
Rea ctivity measurements before operation revealed the excess, and it was reduced by removing some fuel elements.
I&E, Region I was called, per regulations.
Project P,anager, DL, NRR was also called today.
The violation resulted from arithmetical error in calculations.'
Procedures are being reviewed, and a licensee report is being written.
I&E Region I will follow up.
Peach Bottom Unit No. 3 On Saturday, July 19, 1980, we issued an amendment to the Peach Bottom Unit No. 3 Technical Specifications.
In view of the critical power shortage in the eastern United States (as verified by 00E), the staff conducted an expedited review. The amendment rev' sed, temporarily, the specification on inoperable snubbers as it applies.to a specific, single snubber -located on the RMR system.
The change which permitted inoperability of this snubber for 10 days in lieu of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> was authorized based on a reanalysis that the RHR system would remain operable in the event of a Design Basis Earthquake even with a failed snubber.-
Current specifications would require that this snubber be declared inoperable based on a reanalysis of stresses (re: 01E Bulletin 79-14) on the snubber support.
Complete repairs require in excess of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> i
and a shutdown of the unit.
Peach Bottom Unit No. 3 was scheduled to shutdo> n the weekend cf July 25-28 to complete scram testing associated
- with Bulletin 80-17.
D"*]D "]D
_w s M eM 1S a
ENCLOSURE B
L 0FFICE OF STANDARDS DEVELOPMENT L
IMPORTANT EVENTS FOR THE WEEK ENDING JULY 25, 1980 1.
Radiation Policy Council Public Meeting in Boston: The U.S. Radiation Policy Council (RPC) held a public meeting in Boston on Tuesday, July 22, 1980. This was the first of four meetings to be held' at various locations throughout the country. The purpose of the meetings is to obtain comments and suggestions on issues that the RPC should address (agenda items) and on the three topics that it already has under study -- occupational radiation regulations, radon in inhabited structures and low-level radioactive waste
(
(LLW) from medical and research institutions.
The other meetings will be held in Denver, San Francisco and Atlanta during the next two weeks. The NSC will be represented at all meetings.
Karl R. Goller was the NRC's representative at the Boston meeting, which was attended by 40 to 50 individuals, of which 11 made presentations.
All the speakers confined their remarks to one of the three specific topics already identified by the RPC; no new agenda topics for the RPC were identified. All the speakers could be classified as being in favor of activities involving radiation except possibly those addressing the radon-in-buildings problem. Commenters on this topic highlighted the seriousness of the problem, contrasted the Federal Government's treatment of this problem (or lack thereof) with nuclear industry sources of low-level radiation, acknowledged the difficulty of solving the radon problem and suggested possible solutions. The most often repeated coments were that the Federal Government should take the lead in educating the public about radiation and should take steps that would permit incineration or local burial of LLW.
On the last point, discussion disclosed that there are no NRC or other Federal Government prohibitions on disposal by incineration or local burial, although incineration requires explicit approval by the NRC and incineration and local burial are generally prevented by State and local law or "public opinion." The suggested solution was that the Federal Government take a strong authoritative stand on the acceptableness
.of such disposal, so that State and local governments and public opinion might change their present position.
\\
_ [Karl P., Goller, 443-5991]
2 SD Staff /0il, Chemical and Atomic Workers Union Meetino - July 20, 1980: On July 20,1980, members of the SD staff met with the Oil, Chemical and Atomic Workers Union (0 CAW) personnel to obtain the union's input on a regulatory guide that has been published for public comment (0H-902-1, " Instructions Concerning Risk from Occupational Radiation Exposure"). This guide was prepared as a training aid at the request of the Utility Workers Union of America. Approximately 50 OCAW members and officials attended the meeting, including OCAW president, Robert Goss. Many of the comments made will be very useful in the revision _ of the guide, and the meeting was most successful
.from that viewpoint.
ENCLOSURE C
. During a lengthy question-and-answer session which preceded discussion of the guide, OCAW members made several remarks worth noting:
- 1) The NRC overemphasizes. public protectiun at the expense of worker protection;
- 2) The NRC's licensing and inspection program is ineffective regarding worker protection (specific examples were given);
- 3) No one in the NRC will listen to or do anything about complaints made by OCAW members;
- 4) NRC personnel have little or no interest in worker protection; 5)
Federal Government responsibility for occupational radiation protection should be transferred to OSHA.
An bCAW misconception which may be a factor in many of these remarks, especially the last, is the following. OCAW personnel seem to correctiy recognize the differences between DOE and OSHA, but tend incorrectly to equate'the nature of the NRC's operation with that of D0E. They spoke of the NRC and DOE as being "self-policed," as opposed to an " independent" OSHA. OCAW officials expressed their willingness to brief the Commission on their viewpoints on the subject of occupational radiation protection.
[R. E. Alexander, 443-5975]
Publications-to be Issued in the Near Future
Title:
Reporting of Physical Security Events Expected Issuance Date: August 1980
==
Description:==
Guide provides an approach acceptable to the NRC staff for determining whether an event affecting physical security effectiveness should be reported, the time frame for reporting the event and the format that could be used for reporting the event.
Contact:
T. S. Michaels 443-5904
Title:
Standard Format and Content for the-Health and Safety Section of a Renewal Application for Uranium Fuel Fabrication Plants Expected Issuance Date: September 1980
==
Description:==
First of a kind for Renewal Applications for fuel cycle facilities.
Contact:
F. Forscher 443-5910 ENCLOSURE C
,_ -Publication Issued During the Week of July 21-25, 1980 l
Draft Regulatory ' Guide and Value/ Impact Statement: Nuclear Power Plant Simulators for Use in Operator Training, Task RS-110-5; Comments requested by Septenilser 12,-1980.
i t
i 1
i 1
4 I'
.i 4
1 4
1 f
e 1
l' ENCLOSURE C
OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Items of Interest Week Ending July 25, 1980 Spent Fuel Pool Sabotage A Sandia Labs representative briefed the Division of Safeguards on a DOE study which is investigating the explosive sabotage of spent fuel in a cooling pool.
The study is estimating the amount of explosives needed to create a part 100 release at a typical storage site boundary.
Results will be reviewed before NRC begins a study into validation of sabotage consequence estimates through actual testing of scale models.
Physical Protection of Transient Shipments The Transient Shipments paper has been circulated among interested offices for informal comments. These corments have been responded to and a final version of the Commission Paper will be sent out for formal concurrence by the end of J uly.
Commission Requested Report on Statistical Treatment of Inventory Differences A revised draft for the forthcoming Commission Paper on Treatment of Inventory Differences was completed. A list of all comments received from staff reviewers was compiled with the actions taken and reasons therefore.
The list, dicsussion of the issues, and a copy of the draft was transmitted back to the staff reviewers for their final comments and review. The draft with final staff comments, partic-cularly on nonaccepted issues, will be transmitted to the Director of SG and MPA for review on July 31.
Implementation of the US/IAEA Safeguards Agreement All work has been completed on the reporting forms and reporting instructions required to implement the US/IAEA Safeguards Agreement.
The total package for all reports has been forwarded to the Office of Administration for subsequent transmittal to the GA0. The GA0 will submit the package to a public comment period during which all comments and questions will be answered by the NRC.
NFS - West Valley NMSS and ELD staff met with representatives of NFS and New York State ERDA, the co-licensees for the West Valley facility, on July 17, 1980 regarding planned site investigations of the high-level waste storage systems by Rockwell-Hanford under NRC contract. The meeting was held following receipt of letters by the co-licensees from the NRC seeking to initiate the on-site activities without further delay.
NFS had earlier taken a position that prior to granting permission ENCLOSURE D
items of Interest for Rockwell to conduct activities at West Valley, appropriate indemnification agreements must be developed. The involved parties have agreed to attempt to negotiate an acceptable solution to the indemnification issue. The next meeting is scheduled on July 24, 1980 at the NRC offices in Silver Spring, Maryland.
NFS - West Valley Congressional Hearing (Dingell)
Mr. Dircks will provide testimony before the Subcommittee on Energy & Power Committee on Interstate and Foreign Commerce (Chairman Dingell) at 10:00 a.m.
on Monday, July 28, 1980. The hearing will discuss a proposed bill, H. R. 6865, the West Valley Demonstration Project Act.
If passed, the bill would authorize DOE to establish a program for solidifying the high-level liquid wastes which are presently stored at West Valley.
H. R. 6865 has been introduced by Congressman Stanley N. Lundine and Senator Daniel P. Moynihan. The Senate has already passed the bill.
Property Contamination in West Chicago, Illinois An area of contamination (not one of 70-odd previously identified) has been found on private property in West Chicago, Illinois. This particular area is unusual in that elevated levels of alpha activity have been detected at ground level.
The alpha activity ranges from about 8,000 to 16,000 disintegrations per minute per 100 square centimeters, well above NRC limits for release of facilities and equipment for unrestricted use. The total area is about 25 square feet. Region III personnel have confirmed the presence of the contamination.
It is probable that the contamination, like other spots of contamination in West Chicago, is a result of removal of tailings material from the adjacent thorium processing plant before the plant was licensed under the Atomic Energy Act. The plant, now owned by Kerr-McGee, has been closed since 1973.
Region III believes the contamination does not present an immediate safety hazard.
The health physicist consultant to the city agrees with this conclusion. The Mayor of West Chicago has asked the Illinois Department of Public Health to assist in evaluating and solving the problem, and has stated that he planned to publicize the West Chicago situation and ask for help from Congress.
The staff, after conferring with Kerr-McGee, informed the Mayor that the contam-inated soil could be transferred to the Kerr-McGee site if the city wanted to do so.
The Mayor did not accept this suggestion.
ENCLOSURE D
Items of Interest Termination of United Nuclear Plant Operations in Wood River Junction, RI United Nuclear Corporation (UNC), Wood River Junction, Rhode Island, informed the staff that feed to the waste processing system terminated on July 23, 1980.
The process systems in the plant will now be cleaned out in preparation for the previously-announced plant decommissioning.
Rtnewal of B&W Lynchburg Research Center License Materials License NO. SNM-778 for the Babcock & Wilcox Company Lynchburg Research Center (LRC), was renewed July 21, 1980, with an expiration date of July 31, 1985.
The LRC is engaged in research and development activities associated with the development of uranium and plutonium fuel fabrication processes, investigation for improvement in present fuel cycle technology, and the examination and testing of irradiated and unirradiated fuels.
Attendance at Low-Level Waste Subcommittee Meeting Upon request by the State of Texas, E. G. Tourigny of the Division of Waste Manage-ment met with the Low-Level Waste Subcommittee of the Texas Advisory Committee on Nuclear Energy on Wednesday, July 16, 1980, in Dallas, Texas. The responsibility of the Subcommittee is to develop a plan for handling and disposal of low-level waste in Texas.
The general mood of the meeting was that Texas should open up a new low-level waste disposal site for Texas low-level waste and also allow enough flexibility to accommodate a regional concept if it can be developed in a timely manner. The NRC representative acted as a resource person to-the subcommittee in licensing and regulatory matters.
l ENCLOSUPE D
\\
A
OFFICE OF IN!PECTION AND ENFORCEMENT Items t,f Interest Week Ending July 25, 1980 1.
Preliminary Notifications relating to the following actions were dispatched during the past week:
a.
PN0-I-80-102 Oyster Creek - Reactor Trip With Spurious Triple Low Water Level Signal b.
PN0-I-80-103 &~-103A U. S. Radium Corporation, Bloomsburg, PA -
Offsite Concentrations in Excess of 10 CFR 20, Appendix B, Table II, Column 2 Limits c.
PN0-I-80-104 Peach Bottom Units 2 & 3 - Backup Scram System Inoperability d.
PN0-I-80-105 Vermont Yankee - Picket Line Estai.'.ished at Plant Gate e.
PN0-I-80-106 Peabody Testing Services, Pittsburgh, PA - Vehicle Accident Involving Radiography Source f.
PNO-I-80-107 New England Nuclear Corporation, Billerica, MA - Shipment of Package Containing Radioactive Material Without Proper DOT Label g.
PNO-I-80-108 Shoreham - Injury of Worker h.
PN0-I-80-109 Oyster Creek - Contaminated Empty Spent Fuel Shipping Cask 1.
PN0-II-80-125 Oconee Units 1, 2, & 3 - Liquid Radioactive Waste Spill j.
PNO-II-80-126 Sequoyah Unit 1 - U-235 Contamination on Worker's Shoes k.
PN0-II-80-127 University of Florida, Gainesville, Florida - Evacuation of University Reactor Facility 1.
PNO-III-80-135 Dresden Unit 3 - Results of Scram Testing for IEB 80-17 m.
PNO-III-80-136 Nuclear Pharmacy, Inc., Chicago, IL - Abandoned Radioactive Material n.
PN0-III-80-137 Davis-Besse Unit 1 - Loss of Shutdown Cooling Flow o.
PN0-III-80-138 Marble Hill Units 1 & 2 - News Article on " Congressional Influence" Affecting Marble Hill Investigation p.
PN0-V-80-54B San Onofre Unit 1 - Steam Ge.ierator Tube Degradation q.
PN0-V-80-59 Veterans Administration Hospital, Fresno, CA - Damaged Shipment of Radioactive Materials r.
PNO-V-80-60 Nuclear Engineering Company, Richland, Washington Burial Site - Banning of Commonwealth Edison Company, Dresden, Illinois (NRC Licensee) for Radioactive Waste Shipments ENCLOSURE E
- s.
PNO-TMI-80-41 Three Mile Island Unit 2 - Minor Spill at Three Mile Island t.
PNO-TMI-80-42 Three Mile Island Unit 2 - Reactor Building Entry u.
PNS-II-80-18 Browns Ferry Nuclear Plant - Bomb Threat v.
PNS-III-80-14 Clinton - Additional Bomb Threats w.
PNS-III-80-15 Clinton - Additional Bomb Threats x.
PNS-III-80-16 Clinton - Additional Bomb Threat 2.
The following IE Bulletins were issued:
a.
IE Bulletin 80-17, Supplement 1, " Failure of 76 of 185 Control Rods to Fully Insert During a Scram at a BWR," was issued on July 18, 1980 to BWR power reactor facilities with an operating license.
b.
IE Bulletin 80-17, Supplement 2, " Failures Revealed by Testing Subsequent to Failure of Control Rods to Insert During a Scram at a BWR," was issued on July 22, 1980 to BWR power reactors with an operating license, c.
IE Bulletin 80-18, " Maintenance of Adequate Minimum Flow Through Centri-fugal Charging Pumps Following Secondary Side High Energy Line Rupture,"
was issued on July 24, 1980 to PWR power reactor facilities with an operating license and those nearing licensing.
3.
The following IE Circular was issued:
a.
IE Circular 80-17, " Fuel Pin Damage Due to Water Jet From Baffle Plate Corner," was issued on July 23, 1980 to all PWR power reactor facilities with an operating license or construction permit.
ENCLOSURE E J
ITEMS OF INTEREST OFFICE OF INTERNATIONAL PROGRAMS WEEK ENDING JULY 25, 1980 U.S. Support of IAEA Safety Programs U.S. government approval has been given to several proposed actions in support of IAEA's expanded reactor safety program.
$65,000 from 'the 1980 US voluntary assistance pledge to IAEA (USAID appropriation) to pay for a cost-free expert for one year to expedite the preparation and publication of IAEA nuclear power reactor safety guides.
(Expert probably to be recruited from the NRC staff.)
$20,000 for an IAEA workshop on safety considerations of the Westinghouse 2-loop PWR design, to be held in Yugoslavia, for those countries importing this U.S. reactor.
$75,000 to provide a cost-free expert to assist IAEA in designing and implementing an improved management approach for IAEA's technical assistance program.
$50,000 rese rved for a manpower training program currently being defined.
The first two items directly support the expanded IAEA safety program; the latter two provide indirect support, and continuing IP input in their definition and implementation is planned.
-IAEA Symposium on Quality Assurance for Nuclear Power Plants IP has received an IAEA announcement and call for papers for a symposium on QA for nuclear power plants to be held in Paris, France, May 11-15, 1981.
This information has been forwarded to NRR, IE and SD.
The IP contact is Ann McLaughlin-Gore, X27788.
Foreign Assignment The International Atomic Energy Agency has recommended Dr. Jiri Semecky, a Czech national for a ten-month training assignment at NRC.
Czechoslovakia is considered by the IAEA as a developed country.
After discussions IP held with the Department of State in which State raised no objections, IP has requested placement for Dr. Semecky with the Office of Nuclear Reactor Regulation.
ENCLOSURE H
j.
]
t Foreign ~ Visitors-to NRC i
[
. 0n Thursday, Mr. Roger H. Clark, Head of Nuclear Power Assessments, and Mr. Geoffrey A. M. Webb, Assistant Director for Nuclear Assessments, of the U.K. Nationa1' Radiological Protection Board, met with representatives of NRR, SD,.NMSS, and RES to discuss (1) emergency action philosophy, (2) the ALARA principle, and (3) occupational exposure.
' Foreign Reports
~
4 I
1, i
4-4 W
+
l 4
1 e
?
4 i
1 i-i l-l Deleted from PDR copy.-
l' ENCLOSURE H
3-Foreign Reports ' Cont'd I
r 4
i -
Meeting With GA0 IP, ELD and NMSS representatives met with John Tavares of GA0 on July 25 to provide initial staff coments on GA0's draft report entitled "An 3
2 Evaluation of Selected Features of U.S. Nuclear Non-Proliferation Law and Policy." Staff's comments focused on the chapter of the report dealing with i
i the timeliness of the export licensing process.
j.
l 4
'* Deleted from. PDR copy.
ENCLOSURE.H v.
r
--r-
-4+,r m
n w.-
OFFICE OF STATE PROGRAMS, ITEMS OF INTEREST jfEEK ENDING JULY 25, 1980 State Agreements W. Kerr will meet with Region I staff and representatives of Pittsburgh Testing L.aboratories on July 30, 1980 regarding
~ PTL's regulatory program in Agreement States.
4 Program Development On July _18 Jim Montgomery, RSLO RIV, accompanied the Region IV Director and the Public Affairs Officer to a meeting with the Kansas City Star and Times Editorial Board.
i Jim Montgomery also participated in a meeting with Wyoming State officials on July 21 in Cheyenne Wyoming along with representatives of NMSS and ELD.
The purpose of the meeting was to develop a memorandum of understanding for coordination of joint NRC State regulatory efforts on' uranium milling in Wyoming consistent with i
the commission policy of encouraging joint agreements where the party's interests are served.
A draft agreement developed by Wyoming was discussed which included a provision for Wyoming accompaniment of NRC inspectors at mills and in-situ sites.
At a July 15, 1980 press conference the California Office of Emergency Services released a report which recommends the expansion of NRC's 10 mile emergency planning zones to 18 miles.
The report is expected to be discussed with California counties affected by the recommendation at a meeting called by the Office of Emergency Services for July 29 in Sacramento.
Frank Young attended the meeting of the State Planning Council Alternates on Monday, July 21 where refinements of previous policy position-regarding high and low level waste were discussed in preparation for the full Council meeting on September 8 and 9.
4
^
)
ENCLOSURE I
e OFFICE OF mat!AGEiENT AND PROGRAM ANALYSIS Items of Interest WEEK ENDING JULY 25, 1980 FY 80 Authorization Provided ED0's office with a list of tasks and reporting requirements legislated by Congress.
This list will be useful in scheduling our responses.
_ Congressional Correspondence Distributed June report to Office Directors summarizing letters to Congress by Member and by subject.
ENCLOSURE J
O Office of the Controller Item of Interest Week Endino July 25, 1980 FY 1980 Budget The apportionment for t'he supplemental was received from OMB.
Allotments.and financial. plans were issued for the additional supplemental funds and for the increase in the OMB travel ceiling.
7 i
L t
4 d
Enclosure K t
d M
-a~'
+ - ' <
e--
"'*$^~
--e*-
- T e'
G FORTHCOMING SPEAKING ENGAGEMENTS AUGUST cth University of Chicago
~
Subject of talk:
" Personnel Desimetry Performance _aesting,,
Robert E. Alexander 4
ENCLOSURE N