ML19330B778
| ML19330B778 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood |
| Issue date: | 07/30/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reid R COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19330B779 | List: |
| References | |
| NUDOCS 8008050492 | |
| Download: ML19330B778 (1) | |
Text
[
UNITED STATES TIC i
NUCLEAR REGULATORY COMMISSION f
- ,E REGION 111 799 ROOSEVELT ROAD Q
g GLEN ELLYN. ILLINOIS 60137 e
Docket No. 50-454 Docket No. 50-455 Docket No. 50-456 Docket No. 50-457 Commonwealth Edison Company ATTN:
Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
Thank you for your final report dated July 23, 1980, pursuant to 10 CFR 50.55(e) regarding Intermittent Contact Operation of Type W-2 Switches.
We will complete our review of this matter during a future inspection.
Your cooperation with us is appreciated.
Sincerely, h
G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:
Mr. D. L. Peoples, Director of Nuclear Licensing Mr. Gunner Sorensen, Site Project Superintendent Mr. R. Cosaro, Project Superintendent Director, RCI/IE Director, AEOD Chief, OEB/MPA IE Files i
cc w/ltr dtd 7/23/80:
Central Files PDR Local PDR NSIC TIC Mr. Dean Hansell, Office of w
Assistant Attorney General Myron M. Cherry, Chicago 8 0080 50pN
.S
~.